Cooling Tower Meter
NC-v4 WEc4:Water meteringposted by Joseph Snider on
We are trying to determine if our cooling tower meter would count as one of the meters.
LEED Consultant
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Irene Carreno on
Hello. I am working in a LEED project and I coordinate the LEED process from the contractor side ,also the project has a external LEED consultant but I am not very sure of their role.
sDA simulation - window groups for core and shell buildings
NC-v4 EQc7:Daylightposted by Diana Apro on
Dear All, I have difficulties to define window groups for internal shading control when carrying out Option 1 (sDA) daylight simulation for a core and shell office building.
Price of dwelling unit for sale
ND-v4 NPDc4:Housing types and affordabilityposted by Noriko Nagazumi on
We are trying to determine the price of affordable dwelling unit.
Reciprocity b/w ESv3 and LEED MF midrise
Mid-Rise-v4 EAp1:Minimum energy performanceposted by Smita Thomas on
A client needs an energy model for a multifamily midrise that is applying for LEED v4 and also applying for Energy Star.
small community adjustment
NC-v4 LTc5:Access to quality transitposted by nancy picard on
For LEED 2009, there was CIR 431 from the CaGBC that adjusted frequency for communities under 50,000 people. Is there a similar adjustment acceptable for LEED v4?
Is Education still acceptable?
NC-v4 INc1:Innovationposted by Deborah Lucking on
Does anyone have any insight on whether Education is still an acceptable way for a project to achieve an Innovation credit point under LEEDv4? Thanks!
Construction and Demolition Waste Management Plan
NC-v4 MRc5:Construction and demolition waste managementposted by milo valenti on
we are looking for an excel template to do the following! tracking truck picks up C+D takes it to recycling facility!That ticket is expanded into a excel sheet to track what was recycled from that
occupancy sensor in big offices
NC-v4 EAp2:Minimum energy performanceposted by Francesco Passerini on
I read in paragraph 9.4.1.2 b. that "an occupant sensor or a timer switch shall be installed (...) in: (...) 6. office spaces up to 76.2m2". Does it mean that for bigger offices (i.e.
Material Streams in New Construction
NC-v4 MRc5:Construction and demolition waste managementposted by Allison Wilson on
My best understanding is that there are five possible material diversion streams: - Commingled recycled - Donated - Recycled – source separated - Reused - Salvaged My question is this: how do you