Forum quick links
CBECS Data for electric only building
CI-v4 EAc6:Green power and carbon offsetsposted by Travis Gray on
For an office project we are working on, the tenant is only responsible for their electric consumption and will not have any other fuel source dedicated for them.
LEED NC for Most of a Building
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Nathan Gauthier on
Does anybody have any thoughts on certifying an existing building undergoing a major renovation as LEED NC but excluding a relatively small portion of support space that is managed by a different e
Climate Zone for Morocco
NC-v4 EAp2:Minimum energy performanceposted by Jean-Baptiste SARFATI on
Hi, I'm working on a pre-assessment for a project in Morocco and would like to see the minimum wall insulation. I checked in ASHRAE 90.1-2010 but Morocco is not listed in Table B3 International Cl
Suitable Software
CS-v4 IPc1:Integrative processposted by Ciaran McCabe on
Has anyone any advice in terms of suitable software that produces outputs files that meet this credit criteria.
Waste Heat from Landfill Gas Plant
NC-v4 EAp2:Minimum energy performanceposted by Aaron Luthien on
Hello all, We have an office project which utilizes waste heat from the neighbor landfill gas plant. The plant and office is owned by the same company.
Operable windows
NC-v4 EQc5:Thermal comfortposted by Charalampos Giannikopoulos on
For an open-plan office space with individual working spaces the project team has used operable windows in order to provide thermal comfort control.
Option 2 "reduction below industry average"
CI-v4 MRc3:Building product disclosure and optimization - environmental product declarationsposted by Jennifer Rinkus on
For option 2 it states the products must demonstrate impact reduction below industry average in at least 3 categories. Where do I find those "industry averages" to know if my products qualify?
Projects with Several Physically Distinct Structures
NC-v4 MPR3:Must comply with project size requirementsposted by Inés Alomar on
We are starting with the process of certifying a project under v4 for BD+C. It is a hotel with a main building with a main building of 5,000 square meters plus 2 additional small buildings of 1.000
mandatory provisions for systems that are not in scope of work
CS-v4 EAp2:Minimum energy performanceposted by Alessandro Speccher on
hi all, we are doing a feasibility study on a CS major renovation project located in South Italy.
IBR, Institut für Baubiologie in Rosenheim
NC-v4 EQc2:Low emitting materialsposted by Emmanuel Pauwels on
Can we consider the IBR (Institut für Baubiologie in Rosenheim) an approved seal which is compliance with LEED v4 requirement for VOC emissions? Attached you will find information regarding VOC te