Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

BPDO calculator and Furniture

CI-v4 MRc4:Building product disclosure and optimization - sourcing of raw materials
posted by  Michelle Rosenberger  on 

As I understand it, IDC projects are required to use Actual Materials cost and to include furniture in that cost.

2
Sustainability Project Manager
Atkins
LEEDuser Basic Member
59 thumbs up
Thu May 11, 2017, 11:08 pm

Campus application

NC-v4 SSc4:Rainwater management
posted by  Rob Hink  on 

Our LEED project site falls within a larger medical campus which has a campus-wide stormwater management plan which meets the credit requirements.

3
Thu May 11, 2017, 2:36 pm

Average ADC%

NC-v4 MRc5:Construction and demolition waste management
posted by  Michelle Rosenberger  on 

The tracking form is now asking for average ADC produced by the sorting facility. This isn't part of the reporting we get from them. Is this optional?

4
Default Avatar
LEEDuser Expert
472 thumbs up
Tue May 9, 2017, 10:57 pm

residence scenario emission test

Homes-v4 EQc7:Low-emitting products
posted by  Danielle McMahon  on 

Would an Greenguard Gold certified adhesive product eligible for the LEED v4 Home low-emission credit? In other words, if a product claim that they've performed the emission evaluation test that i

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue May 9, 2017, 5:29 pm

Solvent Cement Adhesive for PVC pipes

NC-v4 EQc2:Low emitting materials
posted by  Emmanuel Pauwels  on 

We are trying to find a specific adhesive for PVC pipes.

3
Default Avatar
Project Manager
Entuitive
LEEDuser Basic Member
19 thumbs up
Tue May 9, 2017, 4:18 pm

Conformity of commingled facility process

NC-v4 MRc5:Construction and demolition waste management
posted by  William Leblanc  on 

The commingled waste facility that process our project waste work as follows: They weight the container once it arrives from job site, then separate the diffents matrials into percentage of the loa

2
Director of FM Integration and Sustainability
Shawmut Design and Construction
LEEDuser Basic Member
21 thumbs up
Mon May 8, 2017, 5:27 pm

Zone Air Distribution Effectiveness

NC-v4 EQp1:Minimum indoor air quality performance
posted by  Francesco Passerini  on 

In the office the air (cold in summer, warm in winter) is both wall supplied and ceiling supplied. The air is exhausted from the WCs.

2
Fri May 5, 2017, 2:21 pm

Garbage Truck Maintenance Garage

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Even though the vehicles parked inside the garage are garbage trucks and not vehicles used by FTE employees, can I still consider those parking spaces for Option 2?

4
Energy Engineer
ads ENGINEERS, DPC
LEEDuser Basic Member
21 thumbs up
Fri May 5, 2017, 11:52 am

VOC Content

NC-v4 EQc2:Low emitting materials
posted by  Catherine Blakemore  on 

Hi I am just becoming aquainted with the Low-Emitting Materials Calculator.

4
Thu May 4, 2017, 12:09 am

Design Build Projects

NC-v4 IPc1:Integrative process
posted by  Michelle Rosenberger  on 

Our region primarily uses design build which means that there are two very separate Schematic Design processes for our projects.

4
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Wed May 3, 2017, 4:58 pm