Sourcing of Raw Materials reporting requirements
NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materialsposted by Christine Subasic on
How specific does the location disclosure have to be for the raw material supplier extraction locations? I have a client concerned about revealing proprietary information.
Data Center CxA
NC-v4 EAp1:Fundamental commissioning and verificationposted by Peter Dishno on
The LEED V4 book has the comment: "DATA CENTERS ONLY For small projects with computer room peak cooling loads less than 2,000,000 Btu/h (600 kW) or a total computer room peak cooling load less tha
Maximum threshold for General VOC emissions compliance?
NC-v4 EQc2:Low emitting materialsposted by Joanna Switzer on
Hi, I am not finding any info to suggest a maximum VOC limit allowable under the General Emissions. Does "5.0 mg/m3 or more" really include everything greater than 5.0mg?
Clear definition for interior/exterior needed
NC-v4 EQc2:Low emitting materialsposted by Björn Schön on
The Definition of interior/exterior in the LOW-EMITTING MATERIALS credit is a bit confusing for me.
No FTE
NC-v4 MPR3:Must comply with project size requirementsposted by Claire DeCamp on
We've got a building with no FTE - it houses mostly lab equipment that is managed by a researcher and then left alone. There are no restrooms, offices, etc.
Emission tests for 2-component epoxy flooring systems
NC-v4 EQc2:Low emitting materialsposted by Björn Schön on
According to the LEED v.4 credits, it is possible to use different emission tests outside the US to comply with the requirements. AgBB and DiBt testing method (2010) are mentioned there. But accor
Definition of "Sourced"?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Douglas Flandro on
The credit language says,"For credit achievement calculation, products sourced (extracted, manufactured, purchased) within 100 miles (160 km) of the project site are valued at 200% of their base co
Single certificate or multiple certificates?
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Ricardo Sá on
I am currently involved in the rehabilitation project of a set of school buildings located on the same grounds.
CAV and BAS monitor
CS-v4 EQp1:Minimum indoor air quality performanceposted by Takayuki Hirota on
For CAV, a current transducer on the supply fan, an airflow switch, or similar monitoring device must be installed. If a BAS can monitor airflow fan modes (strong/weak etc.), is that sufficient to
HUD DDA Designation
NC-v4 LTc3:High priority siteposted by Nathan Gauthier on
Can any project get this credit if they're in a DDA area? It seems like the DDA only exists to identify areas where additional subsidy is needed for low-income housing.