"Box" within an exisiting Warehouse
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Gina Dederer on
Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b
carpet
EBOM-v4 MRc3:Purchasing - facility maintenance and renovationposted by Pablo Fortunato Suarez on
This is related to the previous query. I see no reference to certification from the Carpet and Rug Institute which was present in v3.
Confusion over adjacency and shared systems
NC-v4 MPR2:Must use reasonable LEED boundariesposted by GBD Architects on
Hi all, We are looking to certify a new childcare building on a higher-ed campus that will be sharing HVAC systems with an existing childcare building.
FloorScore credit on wall applications
NC-v4 EQc2:Low emitting materialsposted by Rick Farrell on
If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?
Demolition of Interior Wall
CI-v4 MRc2:Interiors life-cycle impact reductionposted by Kerry Honsinger on
The reference guide states that if a wall is demolished and not replaced, it can be excluded from the calculations. Please define 'REPLACED' and 'NOT REPLACED'...
Points possible for IAQ Assessment
NC-v4 EQc4:Indoor air quality assessmentposted by Joanna Ruiz on
I am seeking the two points for the IAQ Assessment by doing the Air Testings. Am I seeking impossible points if the project does not include the point for Low-Emitting Materials?
Generic or Product-specific EPD ?
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Ana García on
Dear All, An international insulation manufacturer has developed an EPD for all its products consisting in rock wool insulation.
Platted Lots by Government
NC-v4 LTc2:Sensitive land protectionposted by soha yamani on
Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?
LEED Boundary and Complete Building Question...
NC-v4 MPR2:Must use reasonable LEED boundariesposted by Roxanne Button on
This may be more in line with MPR #1, but it also has to do with the LEED boundary so I'll post it here first.