Post a question or comment
Credit Filters
Filter by location
Forum
Topic
Replies
Recent

"Box" within an exisiting Warehouse

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Gina Dederer  on 

Our particular project consists of a 400sqm 1 floor "Box" (walls and roof) to be built in its entirety inside a much larger existing warehouse, which itself is part of a large industrial complex (b

3
Default Avatar
URS Deutschland GmbH
LEEDuser Basic Member
3 thumbs up
Tue Feb 7, 2017, 5:22 pm

carpet

EBOM-v4 MRc3:Purchasing - facility maintenance and renovation
posted by  Pablo Fortunato Suarez  on 

This is related to the previous query. I see no reference to certification from the Carpet and Rug Institute which was present in v3.

3
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Mon Feb 6, 2017, 5:30 am

Confusion over adjacency and shared systems

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  GBD Architects  on 

Hi all, We are looking to certify a new childcare building on a higher-ed campus that will be sharing HVAC systems with an existing childcare building.

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Sat Feb 4, 2017, 4:07 am

FloorScore credit on wall applications

NC-v4 EQc2:Low emitting materials
posted by  Rick Farrell  on 

If a FloorScore certified product, specifically a pre-finished engineered wood floor, is applied to a wall or ceiling application does the product contribute to the EQc2 credit in LEED v.4?

4
Independent consultant on VOC issues
formerly with Eurofins Product Testing A/S
LEEDuser Basic Member
246 thumbs up
Wed Feb 1, 2017, 6:41 pm

Demolition of Interior Wall

CI-v4 MRc2:Interiors life-cycle impact reduction
posted by  Kerry Honsinger  on 

The reference guide states that if a wall is demolished and not replaced, it can be excluded from the calculations. Please define 'REPLACED' and 'NOT REPLACED'...

2
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jan 24, 2017, 10:24 pm

Points possible for IAQ Assessment

NC-v4 EQc4:Indoor air quality assessment
posted by  Joanna Ruiz  on 

I am seeking the two points for the IAQ Assessment by doing the Air Testings. Am I seeking impossible points if the project does not include the point for Low-Emitting Materials?

4
Founder & Community Director
Metricorps
LEEDuser Expert
7780 thumbs up
Tue Jan 24, 2017, 9:01 pm

Generic or Product-specific EPD ?

NC-v4 MRc2:Building product disclosure and optimization - environmental product declarations
posted by  Ana García  on 

Dear All,​ An international insulation manufacturer has developed an EPD for all its products consisting in ​rock wool insulation.

2
Editorial Director
BuildingGreen, Inc.
LEEDuser Expert
159 thumbs up
Tue Jan 24, 2017, 8:26 am

Platted Lots by Government

NC-v4 LTc2:Sensitive land protection
posted by  soha yamani  on 

Dear All, If a project lies on a platted plot specified by government (surrounded by streets from four or three sides ) in a desert land : is this considered previously developed plot ?

3
Senior Sustainability Engineer
Metec Consultants
LEEDuser Basic Member
12 thumbs up
Mon Jan 23, 2017, 8:16 pm

LEED Boundary and Complete Building Question...

NC-v4 MPR2:Must use reasonable LEED boundaries
posted by  Roxanne Button  on 

This may be more in line with MPR #1, but it also has to do with the LEED boundary so I'll post it here first.

6
Architect & Sustainable Design Consultant, AIA, MRAIC, LEED AP
Design Synergies Architecture
LEEDuser Basic Member
49 thumbs up
Mon Jan 23, 2017, 5:50 pm

Balconies

CS-v4 SSc3:Open space
posted by  Mike D  on 

Can balconies count as part of open space?

2
Default Avatar
LEEDuser Basic Member
0 thumbs up
Fri Jan 20, 2017, 1:35 pm