Does an entire warehouse have to be heated to qualify for LEED EBOM
Warehouses-EBOM-v4 EAp2:Minimum energy performanceposted by Ralph Bicknese on
I did not receive any replies on my previous post so I am restating the issue. To meet EBOM v4 - Minimum Emergy Performance does the majority of the building have to be heated?
Previously developed land
Warehouses-NC-v4 LTc4:Surrounding density and diverse usesposted by Rebekah Brown on
Hi,
Sustainable wastewater management
NC-v4 INc1:Innovationposted by Takayuki Hirota on
We found that this Innovation credit is listed in the innovation catalog under LEED BD+C: New Construction v4.
LEED O+M as an alternative to ASHRAE level 1 audit
EBOM-v4 EAp1:Energy efficient best management practicesposted by Katherine Ann Resurreccion on
Hi to everyone,
Battery room (Litium-ion)
Data-Centers-NC-v4 EQc1:Enhanced indoor air quality strategiesposted by Suksan Yongwattananun on
Our data center project has had litium-ion battery rooms which the pollution from battery can't occur in normal operation because of the litium-ion battery type.
ventilation in Walk-in Coolers
Warehouses-NC-v4 EQp1:Minimum indoor air quality performanceposted by Francesco Passerini on
Hello, is ventilation in Walk-in Cooler necessary for the prerequisite? Does the request depend on the indoor setpoint temperature?
Innovation: Occupant comfort survey - Conducting Survey?
CS-v4 INc1:Innovationposted by Instra Ingenieros on
Hi all,
We are developing a Core and Shell certification and we pursue the innovation credit "Occupant comfort survey". The innovation credit requirements tell:
Infiltrations
NC-v4 EQp1:Minimum indoor air quality performanceposted by Juan Perez on
Is it feasible to add an infiltration rate into the outdoor air provide per the HVAC to meet the minimum requirement?
No irrigation system- Rainwater
NC-v4 WEc1:Outdoor water use reductionposted by Santiago Avila on
Hello everyone
Currently I am working in a project which does not have an irrigation system, and will be watered with collected water from rainfall.
How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.? Description: I u
Hospitality-NC-v4 MPR2:Must use reasonable LEED boundariesposted by Manzil Shrestha on
How can I register a Resort Project with multiple distinct physical structures with one exceeding 25000 Sq.ft.?