FSC Language in LEED V4

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Dori Hauser  on 

The alternative documentation process for FSC as described in V4 on page 534 is confusing: The issues in particular are: - The woodworker must install the product.

3
Default Avatar
Preconstruction Manager
ISEC, Inc.
LEEDuser Basic Member
0 thumbs up
Wed Mar 18, 2015, 7:20 pm

Data Center Baseline systems

NC-v4 EAp2:Minimum energy performance
posted by  Vassil Vassilev  on 

Greetings everybody I'm modeling a datacenter and there are few issues about which I'm wondering how to proceed. The project consists of two building adhered to each other.

3
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Tue Mar 10, 2015, 2:03 pm

Auditorium seating

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, Does auditorium seating fall under furniture category ? If yes, had we include it for calculation or it is optional ?

2
Wed Mar 4, 2015, 7:11 am

Envelope Commissioning for a Major Renovation

NC-v4 EAc1:Enhanced commissioning
posted by  Eleni Tsivitzi  on 

Does anyone have experience doing envelope commissioning for an existing building? The project will be a Major Renovation with fairly extensive HVAC upgrades.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Thu Feb 26, 2015, 9:20 pm

Charrette duration / delivery flexible?

NC-v4 IPc1:Integrative process
posted by  Vince Briones  on 

Has anyone had success with (2) 2-hr sessions being accepted as compliant (by GBCI) for the integrated design team charrette?

2
LEED Fellow
7group / Energy Opportunities
LEEDuser Expert
4454 thumbs up
Fri Feb 20, 2015, 7:47 pm

Part-load efficiency (IEER)

NC-v4 EAp2:Minimum energy performance
posted by  Charalampos Giannikopoulos  on 

According to Table 6.8.1B of ASHRAE 90.1.2010 it is required that the baseline HVAC systems serving spaces have a specific full-load and part-load efficiency.

3
Thu Feb 19, 2015, 3:37 pm

low emitting materials calculator

NC-v4 EQc2:Low emitting materials
posted by  Caroline PIN  on 

Dear all, I submit this question to leedinfo@usgbc.org in November but I have not yet received a response so I ask you for help.

4
Default Avatar
In charge of environmental certification on a jobsite
EIFFAGE CONSTRUCTION
LEEDuser Basic Member
7 thumbs up
Fri Feb 6, 2015, 2:37 pm

Ongoing Consumables in HC Clinic

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  Michelle DiPenti  on 

Is there a clear answer on which ongoing consumables to include in the policy?

4
Program Coordinator
Transwestern Sustainability Services
LEEDuser Expert
5 thumbs up
Fri Jan 16, 2015, 8:58 pm

EBOM on Core and Shell (not LEED) building

EBOM-v4 MRp1:Ongoing purchasing and waste policy
posted by  LEED Pro Consultant  on 

We are in the process of certifying a Core and Shell building which does not have a previous LEED certification.

3
Tue Jan 13, 2015, 8:18 pm

NC V4: Advanced Energy Metering of Entire Building

NC-v4 EAc3:Advanced energy metering
posted by  Erik Gutierrez  on 

Hello all, I'm looking at metering a new construction building with a single controller.

3
Default Avatar
Mechanical Designer
C&J Technical Solutions and Services, Inc.
LEEDuser Basic Member
0 thumbs up
Mon Jan 12, 2015, 8:19 pm