Forum quick links
Walk-off mats
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Firstly, a happy New Year to each and every one of you. My question is about 3 walk-off mats located at the entrance of the building. Are mats concerned with COV requirement ?
Microfiber cleaning
EBOM-v4 EQc7:Green cleaning - products and materialsposted by Louise Taillon on
are microfiber cleaning cloths, pads, tools included in the calculation for cleaning products and materials? Where does the use of microfiber fit-in to the green cleaning policy?
Residential building above
Retail-CI-v4 EQp2:Environmental Tobacco Smoke Controlposted by Francisco Sanchez Arroyo on
I am thinking of upgrading a v2009 project to V4 but I am concerned if I will meet the requirements of this prerrequisite.
Glazing (windows) area - VOC
NC-v4 EQc2:Low emitting materialsposted by Caroline PIN on
Dear all, Does we need to integrate glazing area in Option 2 : Budget calculation method ? Thank you for your help
Lighting control in office space
NC-v4 EQc6:Interior lightingposted by Jeroen Sap on
I am working on an office building that has overhead lighting that is controlled based on occupancy sensors. The fixtures are grouped per 3,6 meters and there is no manual override.
Link to the v4 Water Calculator
NC-v4 WEp2:Indoor water use reductionposted by Dylan Connelly on
http://www.usgbc.org/resources/indoor-water-use-calculator
Option 2 Simulation
NC-v4 EQc7:Daylightposted by Charalampos Giannikopoulos on
For Option 2 (Simulation) is it accepted to run the simulation for 9.00 and 15.00 on September 21 only, or should it be repeated for March 21st and get the average of both?
Meter Declaration Requirements
EBOM-v4 WEp2:Building-level water meteringposted by LEED Pro Consultant on
Are we exempt of providing the meter declaration if the water-meter has been installed by the water company (government)? What would the criteria for this be?
MR cr2 : Option2
NC-v4 MRc2:Building product disclosure and optimization - environmental product declarationsposted by Remigio Antonio Rancan on
Hi all. I’d like to give the right interpretation about option2.
Pilot Credit 88: LEED O+M Starter Kit
NC-v4 INc1:Innovationposted by Charalampos Giannikopoulos on
In LEED v4 NC, the pilot credit “IPpc88 - LEED O+M Starter Kit” is available to implement for up to 4 points.