Additional Interior Lighting Power

CS-v4 EAp2:Minimum energy performance
posted by  Ricardo Sá  on 

Hi all, I'm currently working in a project of shopping mall (common areas + tenant areas) pursuing LEED certification (Core&Shell).

7
Tue Jan 23, 2024, 11:02 pm
2
Sustainability specialist
Skanska Sweden
LEEDuser Basic Member
205 thumbs up
Thu Jan 18, 2024, 1:01 pm
1
Thu Jan 18, 2024, 9:05 pm

Alternative measurement to material costs

NC-v4 MRc3:Building product disclosure and optimization - sourcing of raw materials
posted by  Ingrid Pohl  on 

I'm working on a project where we cannot gather the information of the specific material costs. Is it possible to calculate the percentage based on the weight or the volume instead of by cost?

0

Pilot credit Design for Indoor Air Quality and Infection Control

NC-v4 INc1:Innovation
posted by  Emily Purcell  on 

Didn't see an existing thread for this one, so I'll start one here. I am including this on a couple different projects and getting ready to submit one for review now.

4
Sun Jan 14, 2024, 12:59 am

Project vs Lighting boundary

NC-v4 SSc6:Light pollution reduction
posted by  Bill Swanson  on 

There appears to still be confusion on the differences between the Project Boundary and the Lighting Boundary. The Project boundary is the same as shown in every other credit.

4
Sr. Electrical Engineer
Integrated Design Solutions
LEEDuser Expert
516 thumbs up
Fri Jan 12, 2024, 9:20 pm
4
Default Avatar
Mechanical Engineer
WSP
LEEDuser Basic Member
2 thumbs up
Fri Jan 12, 2024, 6:33 pm

Walkable Project Site Innovation credit applicable to a university campus building?

NC-v4 INc1:Innovation
posted by  Darrah Jakab  on 

I'm working on a higher ed building in a pedestrian-only area of campus that I believe would be a good candidate for this credit. Has anyone had sucess in achieving this credit for a college c

2
Founder & Senior Consultant
Viable LLC
LEEDuser Premium Member
12 thumbs up
Fri Jan 12, 2024, 1:38 am

View Type 1 with non-continuous window glazing

NC-v4 EQc8:Quality views
posted by  Edgar Arevalo  on 

I have a library that has a reading area with windows surrounding all sides but are separate by the interior wall, which makes the glazing non-continuous.  The wall space between windows are a

8
Director of Sustainability
Fentress Architects
LEEDuser Expert
224 thumbs up
Thu Jan 11, 2024, 6:46 pm

"Weighted sum of non-roof and roof measures" Issue

NC-v4 SSc5:Heat island reduction
posted by  Edgar Arevalo  on 

Under the Summary of Heat Island Reduction Measures, the footnote says "Weighted sum of nonroof and roof measures must be greater than or equal to sum of project paving and roof area for 2 points."

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Thu Jan 11, 2024, 5:43 pm