Difficulty uploading the form

NC-2009 PIf1:Minimum Program Requirements
posted by  Avery Gretton  on 

Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".

1
Thu Dec 10, 2020, 5:01 pm

Reasonable Project Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Katherine Norris  on 

Hello!  The project I am working on is a full renovation of a historic building on a University campus.  The building has three wings connected by "hyphens" to effectively form an "E" sha

1
Wed Jun 19, 2019, 5:38 pm

MPR #6 - Option 3

NC-2009 PIf1:Minimum Program Requirements
posted by  Edgar Arevalo  on 

So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences.  However, since I've been charged with filling out the instructions ta

0

PI Form 1, Must Use a Reasonable Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Vincent Pieri  on 

Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar

0

LEED 2009 Submission deadline

NC-2009 PIf1:Minimum Program Requirements
posted by  Amy Harmon  on 

Is there a deadline for projects that have been registered as 2009?  Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?

1
Thu Nov 15, 2018, 4:58 am

Report multiple electric meters on Energy Star Portfolio Manager

NC-2009 PIf1:Minimum Program Requirements
posted by  Edward Gulick  on 

I am (finally) wrapping up documentation on a multi-tenant building.  It is a LEED-NC project because over 50% of the leaseable space is owner-occupied.  The building has 4 electric

1
Mon Apr 2, 2018, 4:38 pm

CI dependency on other references

NC-2009 PIf1:Minimum Program Requirements
posted by  Radwa Amin  on 

Hi there, should the building be certified by other references such as core and shell, before trying to achieve certification for CI? Thank you

1
Mon Oct 29, 2012, 12:34 pm

Vehicle maintenance and storage

NC-2009 PIf1:Minimum Program Requirements
posted by  Lawrence Lile  on 

I would like to determine if a project could be certified.

1
Tue Jul 2, 2013, 8:27 pm

LEED V4 DATA CENTER

NC-2009 PIf1:Minimum Program Requirements
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Tue Oct 14, 2014, 11:29 pm