Difficulty uploading the form
NC-2009 PIf1:Minimum Program Requirementsposted by Avery Gretton on
Each time that I attempt to upload PI Form 1, this message appears: "Please make sure the correct offline form is uploaded for this credit".
Reasonable Project Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Katherine Norris on
Hello! The project I am working on is a full renovation of a historic building on a University campus. The building has three wings connected by "hyphens" to effectively form an "E" sha
MPR #6 - Option 3
NC-2009 PIf1:Minimum Program Requirementsposted by Edgar Arevalo on
So the project is to submit metering data through the USGBC-approved data template as per the Arch preferences. However, since I've been charged with filling out the instructions ta
PI Form 1, Must Use a Reasonable Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Vincent Pieri on
Our project is registered as a single LEED NC 2009 building located on a previously developed site abutting an existing LEED certified and non LEED certified building site at the North boundar
LEED 2009 Submission deadline
NC-2009 PIf1:Minimum Program Requirementsposted by Amy Harmon on
Is there a deadline for projects that have been registered as 2009? Can these projects use the 2.3 templates or do they need to be submitted using version 4 templates?
Airport Terminal Project Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Kaarina Nehring on
Hi all,
Report multiple electric meters on Energy Star Portfolio Manager
NC-2009 PIf1:Minimum Program Requirementsposted by Edward Gulick on
I am (finally) wrapping up documentation on a multi-tenant building. It is a LEED-NC project because over 50% of the leaseable space is owner-occupied. The building has 4 electric
CI dependency on other references
NC-2009 PIf1:Minimum Program Requirementsposted by Radwa Amin on
Hi there, should the building be certified by other references such as core and shell, before trying to achieve certification for CI? Thank you
Vehicle maintenance and storage
NC-2009 PIf1:Minimum Program Requirementsposted by Lawrence Lile on
I would like to determine if a project could be certified.
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.