LEED CI certificate belongs to Bld Owner or Tenant?
NC-2009 PIf1:Minimum Program Requirementsposted by Regina Gul on
Who owns the LEED Commercial Interiors certificate - the Tenat who hires the LEED AP and pays for the whole certification process, or the Owner of a Building where the Tenat's certified space is l
PIF1 Review Comment Pre-Certification
NC-2009 PIf1:Minimum Program Requirementsposted by Markus Henning on
We recive the following review comment in a pre certification on one of our CS projects.
Certifying an addition to an existing building with LEED NC
NC-2009 PIf1:Minimum Program Requirementsposted by Veronica Reed on
Hello, we are working on a project, an addition to an existing building and we would like to certify but don't know if LEED NC would apply.
LEED-CS v2.0
NC-2009 PIf1:Minimum Program Requirementsposted by Jodie Clarke on
I have a project that registered using LEED-CS v2.0 in 2007.
Structures connected through a walkway
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.
Certify a Building Extension
NC-2009 PIf1:Minimum Program Requirementsposted by Anna Ohlmeier on
Hello all, we would like to certify the extension of an already LEED certified building. Do anyone know if there are other regulations or it is possible to extend the first certification?
Exclude retail?
NC-2009 PIf1:Minimum Program Requirementsposted by Mike D on
Our project has got some retail on the ground floor of an office building that the design team does not want to include in the LEED assessment.
Where is the Special Circumstances Option?
NC-2009 PIf1:Minimum Program Requirementsposted by NA AN on
I got the Agent form signed by the legal department and need to upload to leedonline. They told me to upload under Plf1 using the speical circumstances option.
LEED CI - Scope of work required
NC-2009 PIf1:Minimum Program Requirementsposted by Michael Smithing on
Is there any requirement in the LEED CI MPRs (which I have not found) that a tenant space actually undergo modification to be certified?
Must Use a Reasonable Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Becky Dix on
The project in question is being constructed on an urban medical campus.