Using interpretation 10203 for a hotel site
NC-2009 PIf1:Minimum Program Requirementsposted by Susan Di Giulio on
We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist
Vehicle maintenance and storage
NC-2009 PIf1:Minimum Program Requirementsposted by Lawrence Lile on
I would like to determine if a project could be certified.
LEED V4 DATA CENTER
NC-2009 PIf1:Minimum Program Requirementsposted by Caroline Vallieres on
There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.
CI dependency on other references
NC-2009 PIf1:Minimum Program Requirementsposted by Radwa Amin on
Hi there, should the building be certified by other references such as core and shell, before trying to achieve certification for CI? Thank you
New Construction
NC-2009 PIf1:Minimum Program Requirementsposted by Hugh Hagues on
I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"
LEED Site Boundary
NC-2009 PIf1:Minimum Program Requirementsposted by Sasha Peters on
We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio
ABOUT THIS FORUM
NC-2009 PIf1:Minimum Program Requirementsposted by Tristan Roberts on
This LEEDuser forum is intended to cover Project Information Form 1, which is about documenting compliance with the MPRs.
One single building
NC-2009 PIf1:Minimum Program Requirementsposted by MKK LEED on
We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,
LEED EBOM on Industrial Buildings
NC-2009 PIf1:Minimum Program Requirementsposted by Ricardo Sá on
I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita
Defining 'one building'
NC-2009 PIf1:Minimum Program Requirementsposted by Erin Holdenried on
I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?