Using interpretation 10203 for a hotel site

NC-2009 PIf1:Minimum Program Requirements
posted by  Susan Di Giulio  on 

We have a LEED-NC 2009 hotel project and are trying to determine if we conform to interpretation ID#10203 of 07/01/2012 allowing certain hotel, school and other multiple-building projects to regist

1
Thu Oct 22, 2015, 5:26 am

Vehicle maintenance and storage

NC-2009 PIf1:Minimum Program Requirements
posted by  Lawrence Lile  on 

I would like to determine if a project could be certified.

1
Tue Jul 2, 2013, 8:27 pm

LEED V4 DATA CENTER

NC-2009 PIf1:Minimum Program Requirements
posted by  Caroline Vallieres  on 

There is a new data center extension to an existing building of a different use (office). The extension is accessible via a corridor. The buildings do share an electrical box.

1
Tue Oct 14, 2014, 11:29 pm

CI dependency on other references

NC-2009 PIf1:Minimum Program Requirements
posted by  Radwa Amin  on 

Hi there, should the building be certified by other references such as core and shell, before trying to achieve certification for CI? Thank you

1
Mon Oct 29, 2012, 12:34 pm

New Construction

NC-2009 PIf1:Minimum Program Requirements
posted by  Hugh Hagues  on 

I have a building opened in 1989. Subsequent extension were constructed in 2003. Can I classify the extensions as "new construction?"

1
Mon Nov 19, 2012, 3:21 pm

LEED Site Boundary

NC-2009 PIf1:Minimum Program Requirements
posted by  Sasha Peters  on 

We are currently working for a LEED project which is spread across the project plot area with two office buildings (one “Administrative”- and the other “General”), three warehouses (all unconditio

1
Tue Sep 3, 2013, 3:20 pm

ABOUT THIS FORUM

NC-2009 PIf1:Minimum Program Requirements
posted by  Tristan Roberts  on 

This LEEDuser forum is intended to cover Project Information Form 1, which is about documenting compliance with the MPRs.

0

One single building

NC-2009 PIf1:Minimum Program Requirements
posted by  MKK LEED  on 

We are writing to you because we registered a project like one single building, however the project does not comply with the USGBC definition of ‘one single building’ or LEED interpretation 10203,

1
Thu Oct 22, 2015, 5:40 am

LEED EBOM on Industrial Buildings

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I am aware that LEED for Existing Buildings: Operations & Maintenance is applicable to any commercial and institutional buildings, however, I would like to hear your opinion whether it is suita

1
Thu Jun 20, 2013, 3:23 pm

Defining 'one building'

NC-2009 PIf1:Minimum Program Requirements
posted by  Erin Holdenried  on 

I have a project with two adjacent buildings that are basically physically distinct structures with a short enclosed corridor that connects the two. Can this project be considered one building?

1
Wed Nov 7, 2012, 3:03 pm