Post a question or comment
Credit Filters
Minimum Program Requirements
Filter by location
Forum
Topic
Replies
Recent

Eligibility

NC-2009 PIf1:Minimum Program Requirements
posted by  PAWAN DAHIWAL  on 

I want to get LEED-EBOM certification for my book store (18,000 sq.ft) located on 3rd floor of total 12 floor building. can i eligible to get certification?

1
Thu Dec 27, 2012, 2:23 pm

Scorecard

NC-2009 PIf1:Minimum Program Requirements
posted by  John Riker  on 

We are trying to finish submitting all our credits, and I can't get the check mark for PI-1 on the scorecard to turn green.

1
Tue Oct 15, 2013, 8:35 pm

Download Forms

NC-2009 PIf1:Minimum Program Requirements
posted by  Ralph Bicknese  on 

Hello, I am currently working on a project in which we need independent specs for LEED and we are considering to facilitate the LEED forms to the Contractors so they can get familiar with them bef

1
Sat Jan 16, 2016, 3:23 am

LEED CI certificate belongs to Bld Owner or Tenant?

NC-2009 PIf1:Minimum Program Requirements
posted by  Regina Gul  on 

Who owns the LEED Commercial Interiors certificate - the Tenat who hires the LEED AP and pays for the whole certification process, or the Owner of a Building where the Tenat's certified space is l

1
Tue Apr 23, 2013, 1:06 pm

PIF1 Review Comment Pre-Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Markus Henning  on 

We recive the following review comment in a pre certification on one of our CS projects.

1
Tue Jul 16, 2013, 7:34 pm

Certifying an addition to an existing building with LEED NC

NC-2009 PIf1:Minimum Program Requirements
posted by  Veronica Reed  on 

Hello, we are working on a project, an addition to an existing building and we would like to certify but don't know if LEED NC would apply.

1
Mon Jan 19, 2015, 7:16 pm

LEED-CS v2.0

NC-2009 PIf1:Minimum Program Requirements
posted by  Jodie Clarke  on 

I have a project that registered using LEED-CS v2.0 in 2007.

1
Mon Dec 10, 2012, 2:13 pm

Structures connected through a walkway

NC-2009 PIf1:Minimum Program Requirements
posted by  Ricardo Sá  on 

I'm working on a project that has two structures connected through a suspended walkway. The first consists mainly of warehouse areas (distribution centre) with some auxilliary office areas.

0

Multiple Buildings Project Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Mario S.  on 

We have a project with 3 buildings located on the same plot, that are physically attached by two underground levels made up of technical rooms, parking spaces, bicycle racks, showers and garbage ro

3
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Mon Jun 22, 2015, 2:59 pm

LEED NC 2009 Group Certification

NC-2009 PIf1:Minimum Program Requirements
posted by  Neumann Monson  on 

Our project consists of two buildings on a shared site, to be built in two phases.

2
Director - Green Building Advisory
Colliers International Ltd.
LEEDuser Basic Member
201 thumbs up
Thu May 14, 2015, 4:25 pm