Building Foot Print
NC-2009 PIf3:Occupant and Usage Dataposted by Ahmed Mosa on
We are currently working in the design of an iconic building that has 2 layers of facade.
Breaks, Holidays, and PTO
NC-2009 PIf3:Occupant and Usage Dataposted by Jamison Hill on
Hey LEEDUsers, How should we account for lunch break, paid holidays, and annual leave/PTO in our FTE calculations? 1.
Is the daily average transients a calculation or estimation?
NC-2009 PIf3:Occupant and Usage Dataposted by Meghan Ward on
We are currently working on a office block and have managed to obtain a peak transient amount from the client of 60 transients.
Plumbing & electrical out buildings and Space Usage table
NC-2009 PIf3:Occupant and Usage Dataposted by Erin Holdenried on
I have a building that has multiple separate enclosed buildings for electrical, fire tanks, and water tanks.
"Peak occupants" and "Full-time equivalent (FTE) occupants"
NC-2009 PIf3:Occupant and Usage Dataposted by Marcio Alberto Casado Pereira on
We have a multiple building situation. The changing rooms of one of the buldings (named "P10") serves to the population of the entire campus.
Transient minimums or calculations for barracks
NC-2009 PIf3:Occupant and Usage Dataposted by Lew Bonadies on
Typically we submit 0 transients (visitors) for our Army barracks LEED NC projects. This has been challenged by the reviewer. Are there "minimums" expected for transients, even on an Army base?
FTE of hotel guests
NC-2009 PIf3:Occupant and Usage Dataposted by Rob Hink on
How do I calculate FTE of hotel guests? I know have to do it during non-peak time of year and peak time of year. Also what do I do for visitors and transients?
Determining FTE, PTE
NC-2009 PIf3:Occupant and Usage Dataposted by Catherine Blakemore on
How are the FTE and PTE numbers derived? The project is for a surgical addition.
Plant space in Default occupancy
NC-2009 PIf3:Occupant and Usage Dataposted by Mike D on
We have included all areas of the building within the Default Occupancy Table. However, there is still the Plant Space we have not included. Can this be omitted?
Estimating Occupants in a Medical Office Building
NC-2009 PIf3:Occupant and Usage Dataposted by Craig Pryde on
I am trying to estimate the occupant load for table PIf3-4. Our project will have visitors and patients in addition to staff.