Post a question or comment
Credit Filters
Schedule and Overview Documents
Filter by location
Forum
Topic
Replies
Recent

P1 Form 4 Core and Shell Scope Upload L-6

NC-2009 PIf4:Schedule and Overview Documents
posted by  Phil Meyer  on 

I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance.

1
Mon Dec 17, 2012, 7:28 pm

Appealing period.

NC-2009 PIf4:Schedule and Overview Documents
posted by  Jatuwat Varodompun  on 

Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks

1
Mon Jan 14, 2013, 6:18 pm

PLF4 was not approved because ..& recommendation for final submi

NC-2009 PIf4:Schedule and Overview Documents
posted by  Matt Dem  on 

Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.

1
Wed Jan 21, 2015, 7:34 pm

Translation to american english

NC-2009 PIf4:Schedule and Overview Documents
posted by  Alicia Villanueva  on 

Is it mandatory to translate the mechanical drawings to american english. The project is originally designed in spanish. GH

1
Mon Jul 1, 2013, 8:01 am

P1 form 4: Date team expects to make first LEED submittal

NC-2009 PIf4:Schedule and Overview Documents
posted by  John Eden  on 

If we are doing split review should this date be for the Design Review?

1
Mon Dec 3, 2012, 8:29 pm

Mechanical Plans still under design

NC-2009 PIf4:Schedule and Overview Documents
posted by  Gaston Viau  on 

We haven't finished yet the design of the mechanical system, so the mechanical plans that we have are just a current aproximation. Is it mandatory to upload the mechanical drawings during the desi

1
Mon Jan 14, 2013, 6:14 pm

Project without any HVAC change

NC-2009 PIf4:Schedule and Overview Documents
posted by  Diana Hill  on 

We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.

1
Mon Dec 31, 2012, 2:10 pm

RWH Pond outside LEED Boundary

NC-2009 PIf4:Schedule and Overview Documents
posted by  ABDUL MUTHALIB MOHAMED  on 

Our project building is located in a campus and it is registered individually. Rainwater harvesting pond is located in the campus but it is outside the LEED Boundary.

3
LEED Fellow, WELL AP
JLL
LEEDuser Basic Member
125 thumbs up
Fri Nov 11, 2016, 4:42 am

Estimated Completion Date vs. IEQ testing

NC-2009 PIf4:Schedule and Overview Documents
posted by  Greengrade User  on 

I recall the form saying "estimated" completion date. What can you get away with with "estimated"?

5
Sustainable Design Director, Associate Principal
Opsis Architecture
LEEDuser Premium Member
54 thumbs up
Wed Oct 19, 2016, 10:24 pm

Two story atrium - include 2nd floor in gross area calculations?

NC-2009 PIf4:Schedule and Overview Documents
posted by  Anna Korinkova  on 

We have a project that has a two story atrium, running across the 1st and 2nd floor. Is the 2nd floor atrium (empty) space included in the gross area calculations or not?

2
Managing Partner
Ecoimpact Consulting
LEEDuser Expert
171 thumbs up
Mon May 9, 2016, 5:50 pm