P1 Form 4 Core and Shell Scope Upload L-6
NC-2009 PIf4:Schedule and Overview Documentsposted by Phil Meyer on
I have a question regarding appropriate document types for Upload L-6. The developer intends to achieve LEED credits for the building based on tenant cooperation/compliance.
Appealing period.
NC-2009 PIf4:Schedule and Overview Documentsposted by Jatuwat Varodompun on
Does the announced holidays of GBCI from 25 feb 2012-1 fan 2013 count as holidays and will not be included in 25 bussiness days of appealing preriod? thanks
PLF4 was not approved because ..& recommendation for final submi
NC-2009 PIf4:Schedule and Overview Documentsposted by Matt Dem on
Plf4 was not approved because GBCI is asking int & ext photos & renderings of the building. This was Design Preliminary submission and construction has just started.
Translation to american english
NC-2009 PIf4:Schedule and Overview Documentsposted by Alicia Villanueva on
Is it mandatory to translate the mechanical drawings to american english. The project is originally designed in spanish. GH
P1 form 4: Date team expects to make first LEED submittal
NC-2009 PIf4:Schedule and Overview Documentsposted by John Eden on
If we are doing split review should this date be for the Design Review?
Mechanical Plans still under design
NC-2009 PIf4:Schedule and Overview Documentsposted by Gaston Viau on
We haven't finished yet the design of the mechanical system, so the mechanical plans that we have are just a current aproximation. Is it mandatory to upload the mechanical drawings during the desi
Project without any HVAC change
NC-2009 PIf4:Schedule and Overview Documentsposted by Diana Hill on
We are doing an interior renovation to an existing building. They plan to do only the interior upgrades and no change of the HVAC system.
RWH Pond outside LEED Boundary
NC-2009 PIf4:Schedule and Overview Documentsposted by ABDUL MUTHALIB MOHAMED on
Our project building is located in a campus and it is registered individually. Rainwater harvesting pond is located in the campus but it is outside the LEED Boundary.
Estimated Completion Date vs. IEQ testing
NC-2009 PIf4:Schedule and Overview Documentsposted by Greengrade User on
I recall the form saying "estimated" completion date. What can you get away with with "estimated"?
Two story atrium - include 2nd floor in gross area calculations?
NC-2009 PIf4:Schedule and Overview Documentsposted by Anna Korinkova on
We have a project that has a two story atrium, running across the 1st and 2nd floor. Is the 2nd floor atrium (empty) space included in the gross area calculations or not?