v2009 - SSc1: Site Selection - Wetland Protection
NC-2009 SSc1:Site Selectionposted by Kathy Hrabovsky on
Is a Category 1 Forest Conservation Easement permitted to protect the limits of disturbance between a project site and an existing wetland if the project site is 60', instead of 100', from a wetlan
Previously developed and graded area by municipality - How long before construction?
NC-2009 SSc1:Site Selectionposted by Ilan Yahav on
I am working on a Non-US project that is located in a new neighborhood that had been graded and developed by the local Municipality (roads and sidewalks) in 2006.
Is a Sports Field Considered Graded or Prime Farmland?
NC-2009 SSc1:Site Selectionposted by Sophie Kerr on
Hello,
Previously Developed Site vs. Prime Farmland
NC-2009 SSc1:Site Selectionposted by Jennifer Carlson on
I have a site that is currently on previously developed site. Utilities, sidewalks, etc are already in place. However the Soil Survey says the land the is prime farmland if drained.
Habitat for endangered/threatened species
NC-2009 SSc1:Site Selectionposted by Ashley Hu on
Hello there,
I have two project sites in question.
1) An very urban site that was previously a parking lot
Farmland of Statewide Importance
NC-2009 SSc1:Site Selectionposted by Norma Lehman on
Our project is LEED NCv2009 and the site is designated as "Farmland of Statewide Importance", but not Prime Farmland. We are trying to clarify Prime Farmland v. Farmland of Statewide Importance.
50 foot setback
NC-2009 SSc1:Site Selectionposted by Farah A. on
Do ponds need to meet the 50 ft setback? I understand small man made ponds for recreational, fire supression or stormwater retention purposes are exempt from this setback. Anyone know if these ar
why the distance between the
NC-2009 SSc1:Site Selectionposted by sujata shakya on
why the distance between the previously undeveloped land and a water body is taken 50 feet???? can u more elaborate the reason why the distance is being taken 50 feet......
the documentation language
NC-2009 SSc1:Site Selectionposted by ESRA OZKONUKSEVER on
hi everyone, working on a project outside of U.S. I ve gathered the necessary equivalent documentation for this credit but it s all in the local language.
Is the project located outside the U.S. and using a local equ...
NC-2009 SSc1:Site Selectionposted by Noriko Nagazumi on
Hi. The LEED Online form for this credit was updated recently and now international projects have to "Provide documents identifying how the local equivalent used is equivalent to the referenced".