Forum quick links
Should I include signs on the facade, when I calculate the LDP?
NC-2009 SSc8:Light Pollution Reductionposted by Daniel Strömberg on
Hi, I am working on a building that has commercial activities on the street level floor and offices on the rest of the floors, the project is places in Lz4..
Master's Research Survey
NC-2009 SSc8:Light Pollution Reductionposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Building Facade Lighting
NC-2009 SSc8:Light Pollution Reductionposted by Julien Daclin on
We are calculating the Exterior Lighting Power Density on a project that has building facade lighting on each facade.
Using the centerline as the "site boundary"
NC-2009 SSc8:Light Pollution Reductionposted by Zachary Guren on
The requirements state that for all zones: "Illuminance generated from a single luminaire placed at the intersection of a private vehicular driveway and public roadway accessing the site is allowed
Bollard lighting
NC-2009 SSc8:Light Pollution Reductionposted by Erin Holdenried on
It seems like most bollard lights emit light straight out to the sides at 180 or 360 deg spreads. Therefore allowing a lot of light to be emitted above 90 deg from nadir.
Hotels achieving this credit?
NC-2009 SSc8:Light Pollution Reductionposted by Nelina Loiselle on
Has any one worked on/heard of a hotel project that was able to achieve this credit?
Indoor lighting and working between 11 pm and 5 am.
NC-2009 SSc8:Light Pollution Reductionposted by Lise Dannesboe on
We are working with an office building which has requirements for providing working stations between 11 pm and 5 am.
Questions
NC-2009 SSc8:Light Pollution Reductionposted by Sahar Abi-Ziki on
We are trying to achieve this credit, I have 2 questions; - The municipality has few lighting off our site limit but very close to our LEED boundary.
Sample site plan
NC-2009 SSc8:Light Pollution Reductionposted by Bill Swanson on
I think it would be good to show a sample submittal with a plan view of the site. Most people seem to think this credit is easy since the calculations they've seen were done wrong.
LEED Projecdt Boundary and SSc8
NC-2009 SSc8:Light Pollution Reductionposted by Greengrade User on
Our project is a major rehab of an existing classroom, class lab and academic department office building located on a college campus.