Forum quick links
Exterior Lighting shutoff
NC-2009 SSc8:Light Pollution Reductionposted by Erin Holdenried on
Has anybody been successful in meeting the exterior lighting requirements by using an automatic shutoff control, at say 10PM? I assume this alone is not acceptable.
Automatic shutoff system
NC-2009 SSc8:Light Pollution Reductionposted by Magda Aghababyan on
We have a site with 3 product buildings and a small separate canteen building .
Event Center
NC-2009 SSc8:Light Pollution Reductionposted by Donald Green on
Is there any exception to a project that would only be used 12 times a year (1 time per month) past the 11pm time line for interior lighting levels?
Line of Site into Multi-Story Dorm & Ceiling Mounted Glazing
NC-2009 SSc8:Light Pollution Reductionposted by Sara Zoumbaris on
Has anyone found an answer to the questions regarding line of sight and angles it covers..?
Exterior Lighting for Parking Lot - Directional Fixtures
NC-2009 SSc8:Light Pollution Reductionposted by Alison Y Rivenburgh on
Does anyone know of a manufacturer that makes a parking lot lighting fixture that casts light in only one direction, instead of 2 or 4 directions?
WAter fountain in buildings - exterior lumen ligthing
NC-2009 SSc8:Light Pollution Reductionposted by Alan Viale on
Good morning, I wonder how i should account a WAter fountain in the exterior of my building. It is like this one: http://www.hidroworks.com/galeria.php?id=2 .
LZ3 comment
NC-2009 SSc8:Light Pollution Reductionposted by James Weingarten on
This may stretch a bit outside the LEEDuser realm, but...... I received a comment on a past project, where the reviewer wanted verification that the project was actually a LZ3 as defined by IESNA
SS Credit 8 Compliance
NC-2009 SSc8:Light Pollution Reductionposted by SSN Energy Model on
Hi, We are working for residential project to meet SS Cr 8 requirements. The proposed project has achieved interior lighting requirements.
Turns off the light during the night
NC-2009 SSc8:Light Pollution Reductionposted by Tanja Arnesson on
Hi, I'm working on a project in Sweden where we talked about turing off the exterior light between 6pm and 6am.
LZ2 - LZ3
NC-2009 SSc8:Light Pollution Reductionposted by Marcio Alberto Casado Pereira on
My project is located in an industrial zone, entitled as Urban Area with Priority Densification.