CxA firm or an individual

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Omar Elrawy  on 

Dear All,

I need to know if the CxA can be an individual experienced person, or it must be a Cx firm (office)? 

0

Eligibility for LEED V4 fundamental Cx

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  INES DAHMOUNI  on 

Hello everyone, we are looking a CxA for a LEED project . We contacted an office specialized in energy and environmental studies.

3
LEED Fellow
Integrated Design + Energy Advisors, LLC
LEEDuser Expert
377 thumbs up
Tue Oct 16, 2018, 7:56 am

Alternative Compliance Path for Fundamental Commissioning

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by     on 

Due to an elongated project and construction schedule we'd like to use an alternative compliance path for EAp1 Fundamental Commissioning under LEED NC v2.2.

3
Default Avatar
LEEDuser Basic Member
0 thumbs up
Sun Dec 31, 2017, 8:23 pm

Fundamental Commissioning Timeline

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Todd Bundren  on 

I am working on a project where the Owner Project Requirements and Basis of Design were created at the appropriate times.

1
Fri Dec 15, 2017, 5:26 pm

Fundamental Commisionsing timing question

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Todd Bundren  on 

Our commissioning agent was involved with creation of the owners basis of design documents, they reviewed the design drawings during the design process to verify they were consistent with the ownen

1
Fri Dec 15, 2017, 5:59 pm
1
Fri Oct 8, 2010, 3:02 pm

Required Number of Construction Inspections?

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Benjamin Tressler  on 

Does LEED specify a required number of commissioning inspections during construction? We are trying to develop a scope based on the minimum requirements of LEED.

1
Tue Sep 27, 2011, 1:52 am

OPR Never Produced

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Ed Clark  on 

I was added to the project after construction due to staffing changes. An OPR was never produced. The design meets and exceeds the owner's goals and commissioning has been completed.

1
Wed Jan 23, 2013, 4:56 pm

Contract between the Owner and the CxA

NC-2009 EAp1:Fundamental Commissioning of Building Energy Systems
posted by  Mohamed M. Abd Elhameed  on 

For pursuing EAc3, the contract between the owner and the CxA ensuring CxA involvement in post-construction shall be uploaded through LEED Online credit form.

1
Sun Apr 13, 2014, 2:53 pm