Forum quick links
R-Value for wall assembly
NC-2009 EAp2:Minimum Energy Performanceposted by Sunil S on
I am working on a residential building, the exterior wall assembly as R-19 fill cavity between studs for an 3.5" depth (wood studs 2x4 16" OC) but in the ASHRAE table A3.4, there is no value menti
DCV control
NC-2009 EAp2:Minimum Energy Performanceposted by Rudolph Carneiro on
Can someone help me with exception "b" of mandatory section 6.4.3.9 in 90.1. What is meant by the following: b.
Water heating equipment efficiency
NC-2009 EAp2:Minimum Energy Performanceposted by Renato Sandoval on
As a non-us consultant I always have a problem attending the EA.P2 requirement.
Floodlight
NC-2009 EAp2:Minimum Energy Performanceposted by Ameet AA on
2. Lighting requirement from ASHRAE 90.1-2007 Appendix G?
Chilled Water Required for process
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
Hi Marcus, Our project is a manufacturing building. The 'widget maker' requires chilled water which is typically provided by the chiller/cooling tower.
heating section type
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm modeling a baseline system according to System 5. I am considering Table 6.8.1A in order to determine the performance of the DX cooling coils.
HVAC Climate Zone 1
NC-2009 EAp2:Minimum Energy Performanceposted by John Covello on
Hello, We are working on an office space in climate zone 1. ASHRAE 90.1 does not require heating for these zones. Is some form of cooling such as air conditioning required? John
ASHRAE 90 2007 item 9.4.4
NC-2009 EAp2:Minimum Energy Performanceposted by Iqbal Khalilullah on
Hi Marcus, Please advise me regarding ASHRAE 90.2007 mandatory provision item 9.4.4 which is written as follows: "All exterior building grounds luminaires that operate at greater than 100 W shall
9.4.1.2 (Space Control)
NC-2009 EAp2:Minimum Energy Performanceposted by Carolina Vergnano on
In the item 9.4.1.2 (Space Control) of ASHRAE 90.1-2007, it is not clear if the lights of the classrooms/conference/meeting/break rooms have to be controlled only by occupancy sensors controls.
Exceptional calculation for process load
NC-2009 EAp2:Minimum Energy Performanceposted by Charalampos Giannikopoulos on
What would be the process of an exceptional calculation to prove reduction in process office equipment density for an office building?