pressure drop adjustment System 1
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
Can the pressure drop adjustment (e.g. for fully ducted return or for particulate filtration MERV) be applied to System 1?
Revised Section 1.4 Form Units
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Luthien on
Hello, The new revised section 1.4 form asks the values in US units. Can we fill the form in SI units?
LEED online form
NC-2009 EAp2:Minimum Energy Performanceposted by Sylvain laporte on
Does someone knows why the leed online v4 form( so called newest in the documentation toolkit) does not include the 3 options as it was in the v3 form.
Recommendations for low SHGC glass for curtain wall application
NC-2009 EAp2:Minimum Energy Performanceposted by Helen Samuel on
Hi all, I am looking for some recommendations for the best high efficiency glass that has a very good Solar Heat Gain Coefficient (better than 0.23).
Calculate pump power
NC-2009 EAp2:Minimum Energy Performanceposted by PAWAN DAHIWAL on
hi, i need an answer to calculate pump power. We know the how much gallon of hot water is required per day to serve 26 floor building to meets its DHW requirements.
Interior Lighting Power Requirement in ASHRAE 90.1-2007
NC-2009 EAp2:Minimum Energy Performanceposted by Sandra Holmström on
I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language
Where do I upload the response report for Design Final Package ?
NC-2009 EAp2:Minimum Energy Performanceposted by Matt Dem on
We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.
Lighting,people, and equipment diversity.
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Wright on
I am modelling a large multi use building where the peak occupancy never rises above ~70%. Different areas of the building are used on different days but never all at once.
Major renovation, model rotation
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu
Laboratories - Appendix G Baseline System
NC-2009 EAp2:Minimum Energy Performanceposted by Adam Judge on
G3.1.1, Exception "d" requires laboratory spaces with a minimum of 5000 cfm of exhaust to use a baseline system type 5 or 7 that reduce the exhaust and makeup air volume to 50% of design values dur