Forum quick links
EA advanced Energy metering credit (LEED v4)
NC-2009 EAp2:Minimum Energy Performanceposted by Angelina Ten on
Dear all, Currently I have a project where energy meters comply with all the corresponding credit requirements except that they do not display energy demand.
Manufacturing Plant Addition - Option 3
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Wascher on
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.
Hvac - Baseline System Descriptions
NC-2009 EAp2:Minimum Energy Performanceposted by Marina Andrade on
Hi, I am trying to classify an HVAC System (for the Baseline model) of 3731 m2 distribuited on 6 conditioned floors (HealthCare facilities). Checking the Table G3.1.A (Ashrae 90.1-2007) apparentl
weather data
NC-2009 EAp2:Minimum Energy Performanceposted by Tarek Dalati on
i m using HAP 4.41 for HVAC load calculation and energy modeling but unfortunatly the weather data available is hourly average s it ok to use for leed energy simulation or i ahve to go to another f
What will the minimum OA be if hood exhaust hood is present
NC-2009 EAp2:Minimum Energy Performanceposted by Haojie Wang on
We have a culinary school, the minimum OA per 62.1 is only 10k cfm, but the fume hood exhaust can go above 100k cfm.
Table 1.4
NC-2009 EAp2:Minimum Energy Performanceposted by Khaled Fouda on
I have couple of questions about filling table 1.4.7: 1- Table 1.4.7A asks for the total cooling capacity, I use HAP 4.6 and the cooling capacities are calculated according to ASHRAE 90.1.
Exception to Vestibules in ASHRAE?
NC-2009 EAp2:Minimum Energy Performanceposted by Sara Greenwood on
Hello, I am working on a project in Climate Zone 4 and was wondering if there is any guidance that pertains to buildings with entries that open to a ventilated parking structure which would allow u
Energy Modeling for Support buildings
NC-2009 EAp2:Minimum Energy Performanceposted by SAMY Chamy on
Dear All:- Recently we submit the factory building to LEED as Individual project certification not for group certification.
LEED paperwork for EAp2: Seciton 1.2 - Space Summary
NC-2009 EAp2:Minimum Energy Performanceposted by Doug Cooper on
Does the LEED online form want me to list each space room by room, or are a few overall general space types okay?
purchased heat pumps for ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
Dear Group, As you know additional requirements from LEED led to purchased heat water coils being substituted for furnis heat coils in some unitary systems.