Evidence Required: sample lease(s) associated with LEED
NC-2009 EAp2:Minimum Energy Performanceposted by Jane Long on
Hi All, Could someone please enlighten me as to the relevant of the requirement to “provide the lease(s) or sample lease(s) associated with the LEED project” please? What leases?!
CCHP Modeling
NC-2009 EAp2:Minimum Energy Performanceposted by Jie Shen on
Consultant ERM Apr 20 2016 Guest CCHP System modeling Project Location: Japan My project is provided by CCHP system which owned by third party, the CCHP has two gas generators, one heat reco
Baseline Air Flow Rate
NC-2009 EAp2:Minimum Energy Performanceposted by Alice chen on
Hi All, According the ASHRAE standards, I used system 10 - Heating only and Ventilation for the baseline model.
Baseline External Lighting Calc
NC-2009 EAp2:Minimum Energy Performanceposted by Jean Marais on
I'm using Revised Section 1.4 Tables (October 2012).
Multi-purpose unit for 4-pipe systems
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
I'm considering a "Multi-purpose indoor unit for use in 4-pipe systems for the simultaneous production of chilled and hot water by means of two independent water circuits".
U-value and SHGC for Baseline Fenestration in ASHRAE 90.1
NC-2009 EAp2:Minimum Energy Performanceposted by James Lee on
I am reviewing the residential unit's EAp2 for Hawaii. The U-value and SHGC in ASHRAE 90.1, Table 5.5-1. The title of table (the first raw) says "Assembly Max.
UNUSUAL AND UNIQUE PROCESS LOAD
NC-2009 EAp2:Minimum Energy Performanceposted by Vindio Corro on
We are working in a Project which is a unique green energy research facility (the second to be built in the World), and must receive the LEED Silver standard complying with the South Carolina Energ
School Building
NC-2009 EAp2:Minimum Energy Performanceposted by SSN Energy Model on
Hi, We are doing the Energy Model for SCHOOL Building. The client has proposed Air cooled chiller.
EAp2 Prescriptive Path- Renovation and Addition
NC-2009 EAp2:Minimum Energy Performanceposted by Eric Elizondo on
EAp2- Option 2 Prescriptive Method The current project consists of an existing building that is being renovated along with a new addition to the building.