ASHRAE 90.1- LIGHTING POWER DENSITY SOFTWARE.

NC-2009 EAp2:Minimum Energy Performance
posted by  Ghaleb El Mheirat  on 

We are currenlty in the design process of a building targetting to be LEED certified under version 3.0.

1
Wed Apr 15, 2015, 3:09 pm

Which system

NC-2009 EAp2:Minimum Energy Performance
posted by  David Anderson  on 

I have a project I am trying to model. the overall building is just over 25,000sf. The is an office area that is about 11,000sf and enclosed parking area, and an enclosed utility space.

1
Wed Jul 6, 2011, 9:22 pm

District Cooling system and energy modeling(visualDOE)

NC-2009 EAp2:Minimum Energy Performance
posted by  Mohamed Ravuthar, LEED AP, BD+C  on 

How to handle District Cooling system into energy modeling(visualDOE). 1.Is it required to do energy modeling for District Cooling system for LEED?

1
Sat Jul 7, 2012, 3:18 pm

ERV supply and return fans

NC-2009 EAp2:Minimum Energy Performance
posted by  Jatuwat Varodompun  on 

We have grouped many conditioned zones which the OA will be supplied with central DOA and ERV system. The air from the ERV will be deliver by large fan and return by also a large fan.

1
Mon Nov 7, 2016, 4:35 pm

Recommendations for low SHGC glass for curtain wall application

NC-2009 EAp2:Minimum Energy Performance
posted by  Helen Samuel  on 

Hi all, I am looking for some recommendations for the best high efficiency glass that has a very good Solar Heat Gain Coefficient (better than 0.23).

1
Fri Jul 13, 2012, 4:33 pm

Calculate pump power

NC-2009 EAp2:Minimum Energy Performance
posted by  PAWAN DAHIWAL  on 

hi, i need an answer to calculate pump power. We know the how much gallon of hot water is required per day to serve 26 floor building to meets its DHW requirements.

1
Mon Apr 1, 2013, 7:58 pm

Interior Lighting Power Requirement in ASHRAE 90.1-2007

NC-2009 EAp2:Minimum Energy Performance
posted by  Sandra Holmström  on 

I am wondering whether EAp2 requires a project to fulfill the Interior Lighting Power Allowances in Section 9.5 in ASHRAE 90.1-2007 if Option 1 - Energy Modeling is used? The prerequisite language

1
Fri Aug 15, 2014, 2:24 pm

Where do I upload the response report for Design Final Package ?

NC-2009 EAp2:Minimum Energy Performance
posted by  Matt Dem  on 

We, as a team are getting ready to submit our design final submission and prepared a report to respond to each individual comments made by GBCI.

1
Fri May 22, 2015, 1:34 pm

Lighting,people, and equipment diversity.

NC-2009 EAp2:Minimum Energy Performance
posted by  Eric Wright  on 

I am modelling a large multi use building where the peak occupancy never rises above ~70%. Different areas of the building are used on different days but never all at once.

1
Mon Apr 4, 2016, 10:25 pm

Major renovation, model rotation

NC-2009 EAp2:Minimum Energy Performance
posted by  Saju Varghese  on 

If a project is being demolished but the slab and some columns are being kept, would that be considered a major renovation since we are not given the option of redesigning the orientation of the bu

1
Wed May 1, 2013, 12:26 am