Forum quick links
Baseline Lighting Power density
NC-2009 EAp2:Minimum Energy Performanceposted by Zonda E. Team on
Hi, Can you help with the following two issues: 1.I understand proposed total installed lighitng power has to be the same in the energy model and in SSc8.
Multifamily with curtainwalls
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
If you have a multi-family building with curtain walls can it still meet the requirements for the energy model? How should the baseline be done?
Existing System with New Chiller Plant
NC-2009 EAp2:Minimum Energy Performanceposted by Ante Vulin on
Our project is an existing 36,000 sf museum with a planned 18,000 sf addition. The existing portion is served by a dual-duct HVAC system with a boiler and chiller plant.
Mechanical systems designed but not installed
NC-2009 EAp2:Minimum Energy Performanceposted by April Wang on
Hello all, I am working on a project where a few of the AHUs and FCUs are defined but scheduled to be installed later in the future - phase II.
Heated pool covers
NC-2009 EAp2:Minimum Energy Performanceposted by Ricardo Sá on
I’m currently working on a LEED certification of a public natatorium that has three swimming pool tanks.
5 degree deadband
NC-2009 EAp2:Minimum Energy Performanceposted by Dave Hubka on
How is ASHRAE 6.4.3.1.2 5 degree deadband interpreted? 70-75 deadband provides six temperatures in which the thermostat is "dead".
External lights Interpretation 10236
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
For some external lights the LEED team claimed the LEED Interpretation 10236 for SSc8, i.e.
Baseline PTAC sizing
NC-2009 EAp2:Minimum Energy Performanceposted by April Ambrose on
I have a residential facility seeking LEED v2009 certification with small room loads (approx 2,000 BTU/hr).
Modeling Software Changing
NC-2009 EAp2:Minimum Energy Performanceposted by Muzamil Rafique on
Hello Marcus, I have question regarding the energy simulation software.