Humidification in system 7
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
The design model has an AHU that supplies air for some zones. During the winter season the AHU humidifies the air through an atomising humidifier.
Floor not yet occupied for simulation
NC-2009 EAp2:Minimum Energy Performanceposted by Marcio Alberto Casado Pereira on
I have a 3 storey office building pursuing LEED NC. 2 of the 3 pavements are going to be occupied right after the construction, while the 3rd one will be occupied only 2 years later.
return fan for PTAC
NC-2009 EAp2:Minimum Energy Performanceposted by Francesco Passerini on
G3.1.2.8 states: "If return or relief fans are specified in the proposed design, the baseline building design shall be also be modeled with fans serving the same functions (...)".
Dormitory LPD
NC-2009 EAp2:Minimum Energy Performanceposted by Rebekah Burke on
We have a 4 story college dormatory building, 113,000 SF.
LPD for manufacturing space
NC-2009 EAp2:Minimum Energy Performanceposted by Panupant Phapant on
Hi everyone, The project is cosmetic and medicine manufacturing with office. My question is, What difference between detailed manufacturing and Low/High Bay in ASHRAE90.1-2007 table 9.6.1?
Darkrooms LPD Space by Space Method
NC-2009 EAp2:Minimum Energy Performanceposted by Saju Varghese on
We have a darkroom in a facility but Im not sure if it should be classified as active, inactive storage or other type of classification for the space by space method.
DHW Model Inputs
NC-2009 EAp2:Minimum Energy Performanceposted by Wes Lawson on
All, We are attempting to accurately model the gas energy usage for the DHW system in a recent residential building.
process load: water treatment plant
NC-2009 EAp2:Minimum Energy Performanceposted by Mark Palmer on
I see that several water treatment plants on the LEED registered and certified list.
EA advanced Energy metering credit (LEED v4)
NC-2009 EAp2:Minimum Energy Performanceposted by Angelina Ten on
Dear all, Currently I have a project where energy meters comply with all the corresponding credit requirements except that they do not display energy demand.
Manufacturing Plant Addition - Option 3
NC-2009 EAp2:Minimum Energy Performanceposted by Aaron Wascher on
I am working on a manufacturing facility addition where the owner wants to pursue LEED certification. The LEED energy model turned out that we are not going to meet the 10% minimum.