Level of detail (cfm) with Trane Trace for LEED -S & L buildings
NC-2009 EAp2:Minimum Energy Performanceposted by Maria Spastri on
Hi all, For the people who have submitted for LEED (v3) using Trane Trace: To what level of detail do you model the heating and cooling cfm and exhaust cfm on room/zone level for large buildings?
Compliance with Table 7.8 - Service hot water
NC-2009 EAp2:Minimum Energy Performanceposted by Ward Miller on
As far as we read the Mandatory Requirements of ASHRAE 90.1 required by EAp2, performance requirements must meet the specifications of Table 7.8.
Water cooled chillers for very dry areas
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Rodriguez on
Dear forum, We have a very critical problem for a LEED C&S 2009 project located in the north of Mexico. The project will be a 13th story office building.
Mandatory requirements
NC-2009 EAp2:Minimum Energy Performanceposted by Rathnashree Bharadwaj on
Recently, there was a discussion in this forum on exterior lighting being a mandatory requirement for EAP2 compliance.
Dining facility overall area with or without walk-in coolers
NC-2009 EAp2:Minimum Energy Performanceposted by Addisu Lemlem on
To generate baseline for HVAC systems, the building total SF is 28000 including walk-in coolers and an outside mechanical room. My question is, Can I model the walk-in cooler separate?
Clarification on the use of ACMV system
NC-2009 EAp2:Minimum Energy Performanceposted by Andrew Xiao Junzhao on
I am currently working on a project in Kenya. The cooling load for the commercial office tower is around 1900RT. This project will attempt for LEED CS and will be targeting Silver rating.
Non-fossil fuel in district heat
NC-2009 EAp2:Minimum Energy Performanceposted by Jens Apel on
This question relates to the thread below (“Absorption chiller in baseline model”) but is of more general nature.
Design submittal - Tender LOD Documentatio valid for EAp2?
NC-2009 EAp2:Minimum Energy Performanceposted by Santiago Velez on
Dear all, I'm am modelling a project that is aiming to get EAp2 at design submittal with Tender Documentation LOD (Level of Detail), meaning there are lots of parameter only defined by technical sp
Baseline, section 6.4.3.9 and G3.1.1, single zone system
NC-2009 EAp2:Minimum Energy Performanceposted by Sarah Leenknegt on
Dear all, I have an office building with an auditorium, which is served by the same AHU that serves the surrounding office.