Outdoor Pool

NC-2009 EAp2:Minimum Energy Performance
posted by  Chet Knaup  on 

Hey, I have a Multi-Story Office building that is looking to achieve 19 points by purchasing PV Panels to offset the energy consumption.

1
Thu May 16, 2013, 5:09 am

Review comments on widow U-value

NC-2009 EAp2:Minimum Energy Performance
posted by  Chris Miller  on 

We received the following review comments during our design review and my question is, where do I find the Uvalue for the frame & glass assembly mentioned in their comments(this is a storefront

1
Fri Dec 13, 2013, 10:15 pm

CHP Usage

NC-2009 EAp2:Minimum Energy Performance
posted by  SAMY Chamy  on 

Dear Sir:- we have Project in China it is a NC project We don't get Electricity from Government we use natural Gas Generator for Electricity Production.

1
Wed Jul 15, 2015, 2:15 pm

District Central plant heating only

NC-2009 EAp2:Minimum Energy Performance
posted by  Vipul Babriya  on 

I have a project with district steam from central plant for space heating only. The space cooling is provided by onsite using RTUs with Dx coil.

1
Tue May 24, 2016, 7:47 pm

Natural Ventilation Loads Modeling

NC-2009 EAp2:Minimum Energy Performance
posted by  Sefa Sahin  on 

Dear All, We are working on residential building in Istanbul/Turkey. The building is heated and cooled by radiators and split AC respectively.

1
Fri Apr 21, 2017, 2:15 pm

Baseline System configuration for mixed use condominium

NC-2009 EAp2:Minimum Energy Performance
posted by  Jason Biondi  on 

We are working on a 10 story mixed use building consisting of approx.

1
Sun Nov 2, 2014, 11:51 pm

40% WWR does it include the wall connected to other building?

NC-2009 EAp2:Minimum Energy Performance
posted by  Haojie Wang  on 

I wonder if the wall is directly connected to adjacent building ,should we include them in the window to wall calculation?

1
Tue Jun 14, 2016, 2:01 pm

Outdoor Air Intake: Baseline vs. Proposed

NC-2009 EAp2:Minimum Energy Performance
posted by  Ricardo Sá  on 

We are currently working on a LEED project whose Baseline Building will have an HVAC system 5 installed.

1
Mon Nov 12, 2012, 2:46 pm

Baseline HVAC schedules

NC-2009 EAp2:Minimum Energy Performance
posted by  Vernon Smith  on 

The project will apply for certification under LEED v2009 NC. The Proposed design is a 50,000 sf three story building (two above ground plus a full basement) with a central atrium.

1
Mon May 8, 2017, 2:23 pm

Garage Lighting LPDs

NC-2009 EAp2:Minimum Energy Performance
posted by  Joseph Snider  on 

ASHRAE lists .2 w/sf for garage spaces in Space by Space, and .3 w/sf in Building Area method.

1
Tue Sep 15, 2015, 10:02 pm