Forum quick links
break hp vs Comercial hp
NC-2009 EAc1:Optimize Energy Performanceposted by TOMAS URIBE on
What is the correct approach when simulating pumps and fan power in the proposed case?. size the electric motors with the bhp or the next commercial motor size.
ASHRAE 90.1-2015 to 2007 equivalency table
NC-2009 EAc1:Optimize Energy Performanceposted by Luis Huertas on
We are working on a project that is using ASHRAE 90.1-2015 version and we are looking for a table listing the equivalency of points similar to the one done for the 2010 version?
DES with CHP, electric and absorption chillers and boilers
NC-2009 EAc1:Optimize Energy Performanceposted by Ricardo Sá on
A building pursuing LEED 2009 NC certification will be located in a campus with a District Energy System (DES) that incorporates a CHP, absorption chillers, electric chillers and boilers.
ASHRAE 90.1-2007 article G3.1.1 exception (a)
NC-2009 EAc1:Optimize Energy Performanceposted by Ann-Judith Belanger on
Hi everyone, I have a question regarding the reference's HVAC heating energy source for my projet.
Leed 2009 NC-District cooling path one
NC-2009 EAc1:Optimize Energy Performanceposted by Mark JIN on
Dear Friends, I have a project located at Dubai where a localized existing district cooling plant will be providing chilled water.
n/a
NC-2009 EAc1:Optimize Energy Performanceposted by SAMY Chamy on
Dear Marcus..... Greetings... In one of our project , we have CHP which fall under Case 1 as given in LEED Guide, CHP under Same Ownership..We have 2 nos of 500 KW Gas Generator which supplies
Compliance Documents for EAp2 and EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi all, I am working on my first LEED modelling work with IES and wondering what documents are needed for the submission for EAp2 and EAc1.
Counting RECs Towards EAc1
NC-2009 EAc1:Optimize Energy Performanceposted by Waleed AlGhamdi on
Hello, We have a project that is part of a campus and has a significant PV array that offsets about 35% of the building's energy costs.
Mandatory 18% energy saving after April 2016
NC-2009 EAc1:Optimize Energy Performanceposted by Indochine Engineering VN on
Hi, I just read requirement of EAc1 on USGBC web page, is it true that all LEED New Construction projects registered after 8 April 2016 have to reach 18% - 4 points at minimum.
ASHRAE Baseline Constructions
NC-2009 EAc1:Optimize Energy Performanceposted by Alice chen on
Hi All, I am working on a large warehouse building with a small office building on the site. The warehouse is heated only, so I suppose that is semiheated space, is that right? While the office