Forum quick links
Solar PV System Degradation
NC-2009 EAc2:On-Site Renewable Energyposted by Katherine Ann Resurreccion on
Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.
Applicable for On-Site Renewable credit?
NC-2009 EAc2:On-Site Renewable Energyposted by Jeff H. on
My company is considering a geothermal system for an industrial facility.
EAC2 in a Positive Energy Building
NC-2009 EAc2:On-Site Renewable Energyposted by Milena Rafols Salvador on
We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.
Renewable energy fraction; with or without process energy?
NC-2009 EAc2:On-Site Renewable Energyposted by Roberto Oshiro Gama on
Hi, I have a question about the renewable energy fraction. For a industry, the renewable energy fraction must be considered as a fraction of total energy demand or as a fraction of tolal energy wit
Building Type
NC-2009 EAc2:On-Site Renewable Energyposted by Geraldine Assmus on
I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.
Can Low missission gas generator qualify for EAc2?
NC-2009 EAc2:On-Site Renewable Energyposted by Mahbuba Khan AIA, LEED AP BD+C on
I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.
LEED exam question
NC-2009 EAc2:On-Site Renewable Energyposted by Farah A. on
A project team is looking to pursue an ID credit on their new office building. The annual building energy cost for their 400,000 square foot project is $15,120.
Waste Heat Recovery Boiler
NC-2009 EAc2:On-Site Renewable Energyposted by SAMY Chamy on
Dear All:- we have two waste recovery boiler to fulfil the steam needed.