Solar PV System Degradation

NC-2009 EAc2:On-Site Renewable Energy
posted by  Katherine Ann Resurreccion  on 

Our Solar PV system supplier provided us a calculation of how much solar energy is generated per annum. It is projected that there will be a solar degradation factor of 1% each year.

1
Tue Feb 10, 2015, 1:41 pm

Applicable for On-Site Renewable credit?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Jeff H.  on 

My company is considering a geothermal system for an industrial facility.

1
Sun Sep 4, 2011, 2:43 am

EAC2 in a Positive Energy Building

NC-2009 EAc2:On-Site Renewable Energy
posted by  Milena Rafols Salvador  on 

We are certifying a Positive Energy Building, that will produce 130% of its energy consumption with solar PV. All the energy produced with the PV will be sold to the grid.

1
Thu Nov 8, 2012, 7:15 pm

Renewable energy fraction; with or without process energy?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Roberto Oshiro Gama  on 

Hi, I have a question about the renewable energy fraction. For a industry, the renewable energy fraction must be considered as a fraction of total energy demand or as a fraction of tolal energy wit

1
Tue Nov 12, 2013, 2:42 pm

Building Type

NC-2009 EAc2:On-Site Renewable Energy
posted by  Geraldine Assmus  on 

I'm trying to certify a Retail Store under LEED ID-Retail 2009 in Buenos Aires, Argentina. There is no info in Leed User for this credit.

1
Fri Jul 3, 2015, 3:10 pm

Can Low missission gas generator qualify for EAc2?

NC-2009 EAc2:On-Site Renewable Energy
posted by  Mahbuba Khan AIA, LEED AP BD+C  on 

I am doing a factory building in Dhaka Bangladesh. To offset the power outage, they are going to use gas generator.

1
Tue Apr 23, 2013, 4:14 pm

LEED exam question

NC-2009 EAc2:On-Site Renewable Energy
posted by  Farah A.  on 

A project team is looking to pursue an ID credit on their new office building. The annual building energy cost for their 400,000 square foot project is $15,120.

1
Sun Feb 23, 2014, 9:47 pm

Waste Heat Recovery Boiler

NC-2009 EAc2:On-Site Renewable Energy
posted by  SAMY Chamy  on 

Dear All:- we have two waste recovery boiler to fulfil the steam needed.