Monitoring in a multi residential complex
NC-2009 EAc5:Measurement and Verificationposted by lance mccardle on
How is this credit addressed in a multi residential complex (77 student apartments) where tenants pay their own energy bills?
EAc5 Option 3
NC-2009 EAc5:Measurement and Verificationposted by Crina Bosch on
We have a large project that is on a DES - We meet the criteria that forces us to include upstream DES equipment.
Energy Star Portfolio Manager Naming
NC-2009 EAc5:Measurement and Verificationposted by April Ambrose on
PIf4 says: Note: Project titles in portfolio manager must be the same as the LEED registered project name.
LEED NC 2009 - EAc5 - M&V
NC-2009 EAc5:Measurement and Verificationposted by Genko Ganev on
Would GBCI accept meter data entry into Energy Star Portfolio Manager for 12 months period as an approved method for M&V for new construction?
VAV System with Reheat
NC-2009 EAc5:Measurement and Verificationposted by Maya Karkour on
Dear All, We have a project installing a VAV air conditioning system with electrical reheat boxes in each zone. The current design assigns energy submeters combining both the electrical reheat wi
Developing the plan post-construction
NC-2009 EAc5:Measurement and Verificationposted by Maura Adams on
Is there any reason that we couldn't develop an M&V plan post-construction, assuming we have the necessary controls in place?
Mixed Use Building Residential + Commercial
NC-2009 EAc5:Measurement and Verificationposted by Saju Varghese on
We are working in a project for which we will be pursuing LEED NCv2009. It is a mixed use (residential and commercial) building.
LEED NC 2009 EAc5 Measurement and Verification
NC-2009 EAc5:Measurement and Verificationposted by Jim Gardler on
We have developed a M&V plan for a mixed use Multi tenant high rise with commercial space in the building with the International Performance Measurement and Verification Protocol (IPMVP) as the
EAc5 v2009 putting together M&V at the end of the project
NC-2009 EAc5:Measurement and Verificationposted by Lou Niles II on
We are extremely late in a project and the team believes we intended to attempt EAc5 all along. When is it too late to achieve / document for EAc5 M&V for NC v2009?