Reuse roof joists But not roof deck
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by C. Anne Brockelman on
I am working on a renovation project of a courthouse. We will be reusing the roof joists but will remove all the existing roof deck.
Curtain Wall Should Be Exterior Wall or Glazing?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Sara Zoumbaris on
Is a large curtain wall to be considered as exterior wall or glazing for this credit? Thank You!
Existing Parking - Reuse Structural Slab
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nanechka Pagan on
The project that I am currently working have an existing structural floor slab (previously used as a parking lot; doesn't not have roof/walls), the current design intent is to maintain more than 6
Reused area of column and beam
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Zhantong Chen on
In MR c1.1, how to calculate the column and beam area?
Major renovation with re-insulation of external walls and roofs
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Qian Tang on
Dear All, I´m working on a major renovation project. All the external concrete walls, roofs and pillar should be maintained but the insulation layer above the concrete will be changed with the bett
Frankenstein Building Reuse
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Brett Beckemeyer on
I am currently working on a project that has had 7 different additions dating back to 1956.
Building Relocation
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Nativa Architecture on
If we decide to move a pavilion from Expo area to a new site, shall we take any "Building reuse" credits? All most of core and shell elements will be reused.
Building Demolition
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by Chris Eger on
We are demolishing a large building that is no longer in use and is twice the size of an existing portion being retained.
No floor
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by April Ambrose on
A spec-built, cold-dark shell of a building was built with 4 walls and a roof, but the floor is still dirt.
How are doors calculated?
NC-2009 MRc1.1:Building Reuse—Maintain Existing Walls, Floors and Roofposted by David Gruss on
Are doors excluded in the same way as windows are excluded? If not, would new doors in existing frames count against your percentage reused number for a wall area? Cheers, David