Water waste
NC-2009 MRc2:Construction Waste Managementposted by Karim Farah on
During coentsruction, a project has a major amount of water waste (more than 50% of the total amount of the waste generated by one production unit), this quantity of water is a result of the produc
Gypsum board recycling resource, Saudi Arabia
NC-2009 MRc2:Construction Waste Managementposted by Shreepad Bandagi on
Wondering if anyone would have a resource for gypsum board recycling anywhere in Saudi Arabia. Thanks!
Construction Waste management
NC-2009 MRc2:Construction Waste Managementposted by Piotr Podhajny on
What if you have two buildings each persuing LEED certification both build by the same contractor but two owners. How do you seperate the waste amount from both building?
Product Takeback Programs?
NC-2009 MRc2:Construction Waste Managementposted by Jonathan Weiss on
Some manufacturers have "take-back" programs where they will take back unused surplus materials and restock them - the WBDG has that listed under masonry and other spec sections.
collecting recyclables together
NC-2009 MRc2:Construction Waste Managementposted by Adrienn Gelesz on
If plastic and paper is collected together in the same container and taken to a common facility where both are recycled, does this count as commingled waste or can we track this as one waste catego
Concrete Waste
NC-2009 MRc2:Construction Waste Managementposted by sompoche sirichote on
We have a good amount of concrete scrap that we intend to use as backfilling material on-site and at another site. Will this be considered as waste diversion? Thanks.
Recycling Batteries
NC-2009 MRc2:Construction Waste Managementposted by Paola Medina on
One of our environmental companies have a lot of batteries that they want to recycle in our LEED project instead of send to landfills through encapsulate with concrete in the background hole of ele
Demoltion before possession
NC-2009 MRc2:Construction Waste Managementposted by Pamela Lippe on
If demolition is done by a landlord before a tenant has taken possession, does it have to be included in the calculations for LEED CI?.
Strategy/ Methodology to divert concrete waste from Landfill
NC-2009 MRc2:Construction Waste Managementposted by Mohd Imran Shaikh on
We are currently aiming to achieve this credit on a project by providing on site infrastructure to separate waste and divert from landfill.
Documentation for Existing Materials used on third party sites
NC-2009 MRc2:Construction Waste Managementposted by Martin Miille on
To make room for our new structure, we have some existing metal buildings on our site that will be dismantled and reassembled by others on someone else's property.