Forum quick links
Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
Material Reuse
NC-2009 MRc3:Materials Reuseposted by Scott Gharda on
I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.
Cost to be Excluded in the total proj material costs for MR CR3
NC-2009 MRc3:Materials Reuseposted by Benjie Herrera on
I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.
Salvaged granite block
NC-2009 MRc3:Materials Reuseposted by Sara Sweeney on
Hi I am working on a project where 83.75 tons of granite slabs were removed from a site during site clean-up for the new bilding being built.
Material reuse based on cost or volume
NC-2009 MRc3:Materials Reuseposted by Mahbuba Khan AIA, LEED AP BD+C on
I am working on an international LEED NC 2009 project.
Salvaged Materials Code Conflict
NC-2009 MRc3:Materials Reuseposted by Annalise Reichert on
I am working on a 17-story multi-family new construction project in California that will not involve any demo of existing structures at the site.
Is soil a material considered on this credit?
NC-2009 MRc3:Materials Reuseposted by Albert Sagrera on
Would you consider the reuse of soil on this credit? The situacion is that the soil extracted for the building construction is not send to dump but it's reused on the modeling of landscape.
Documenting costs and cut sheets
NC-2009 MRc3:Materials Reuseposted by John Covello on
Hello, Our project will be purchasing old teak wood (in good shape) from housing that is to be demolished. The invoices may be simple hand written pages noting the pricing and date.
Material Reuse on Other Buildings within Site Boundary
NC-2009 MRc3:Materials Reuseposted by Josh Sawyer on
We are working on project that has four buildings connected together on the site.
Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for