Materials Reuse-Clarification of credit implementation
NC-2009 MRc3:Materials Reuseposted by Elle Brown on
Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for
Calculating materials costs to achieve MR credits
NC-2009 MRc3:Materials Reuseposted by Remigio Antonio Rancan on
Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.
Material reuse
NC-2009 MRc3:Materials Reuseposted by Ameet AA on
If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.
Dismantling of building
NC-2009 MRc3:Materials Reuseposted by Tanja Arnesson on
Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.
Re-using shale and theater seating
NC-2009 MRc3:Materials Reuseposted by Michelle Meis on
I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.
Buried crushed concrete
NC-2009 MRc3:Materials Reuseposted by Maria Isabel Conde on
We are demolishing an existing building. The team is considering burying the concrete, without this being used as fill for the new building. Could this account for the MRC2? Thanks,
Demolished Building - Material Reuse
NC-2009 MRc3:Materials Reuseposted by Lauren Bellamy on
Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.
Trees on site to be used for furniture, blocking and/or veneer.
NC-2009 MRc3:Materials Reuseposted by Seonhee Kim on
If some of trees on site need to be cleared and we decide to use it for furniture, blocking and/or veneer, does this count as MRc3?
Material Reuse
NC-2009 MRc3:Materials Reuseposted by Scott Gharda on
I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.
Cost to be Excluded in the total proj material costs for MR CR3
NC-2009 MRc3:Materials Reuseposted by Benjie Herrera on
I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.