Post a question or comment
Credit Filters
Materials Reuse
Filter by location
Forum
Topic
Replies
Recent

Materials Reuse-Clarification of credit implementation

NC-2009 MRc3:Materials Reuse
posted by  Elle Brown  on 

Can some one clarify if I'm understanding the implementation of this credit correctly? If material is salvaged onsite it must be used in a purpose other than for which it was intended (except for

1
Thu May 3, 2012, 3:44 pm

Calculating materials costs to achieve MR credits

NC-2009 MRc3:Materials Reuse
posted by  Remigio Antonio Rancan  on 

Hi all, i don't find Table 2 indicated in LEED reference Guide for green BD+C p. 337. Can anyone help me? Thanks a lot.

1
Sun Oct 27, 2013, 5:00 pm

Material reuse

NC-2009 MRc3:Materials Reuse
posted by  Ameet AA  on 

If the materials are to be reused, ship from another country would it assist for attaining any LEED Credits? As i understand it would not be sustainable in terms of carbon emission.

1
Fri Apr 6, 2012, 6:56 pm

Dismantling of building

NC-2009 MRc3:Materials Reuse
posted by  Tanja Arnesson  on 

Hi, We have a site were four different buildings will be conducted. Within the contract from the municipality demolition of two buildings should be carried out before the new construction.

1
Thu Feb 7, 2013, 7:04 pm

Re-using shale and theater seating

NC-2009 MRc3:Materials Reuse
posted by  Michelle Meis  on 

I am on a project that is installing geothermal. The company that will be drilling the wells is planing on re-using the shale that is removed during the process.

1
Fri Oct 4, 2013, 1:21 am

Buried crushed concrete

NC-2009 MRc3:Materials Reuse
posted by  Maria Isabel Conde  on 

We are demolishing an existing building. The team is considering burying the concrete, without this being used as fill for the new building. Could this account for the MRC2? Thanks,

1
Thu Jun 19, 2014, 9:02 pm

Demolished Building - Material Reuse

NC-2009 MRc3:Materials Reuse
posted by  Lauren Bellamy  on 

Our client has demolished the existing structures on our site and salvaged all the cladding and flooring materials (i.e.

1
Tue Sep 22, 2015, 8:48 pm

Trees on site to be used for furniture, blocking and/or veneer.

NC-2009 MRc3:Materials Reuse
posted by  Seonhee Kim  on 

If some of trees on site need to be cleared and we decide to use it for furniture, blocking and/or veneer, does this count as MRc3?

1
Wed Mar 20, 2013, 11:15 pm

Material Reuse

NC-2009 MRc3:Materials Reuse
posted by  Scott Gharda  on 

I am working on a project where we will be renovating an existing 2 story warehouse to turn it into office space.

1
Mon Jan 30, 2017, 10:49 pm

Cost to be Excluded in the total proj material costs for MR CR3

NC-2009 MRc3:Materials Reuse
posted by  Benjie Herrera  on 

I just want to inquire if we will include HVAC equipment, PV arrays, Solar hotwater collectors, generator, fire alarm control panels, etc.

1
Wed Sep 21, 2011, 4:29 pm