Forum quick links
Natural Ventilation Form Filling
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Levey on
Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.
62MZ calc for critical zones
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.
Compliance for LEED, ASHRAE 62.1. Ventilation System controls
NC-2009 IEQp1:Minimum IAQ Performanceposted by JOSE R. TAGLE on
To meet the minimum requirements from section 4 to 7 of ASHRAE 62.1-2007, we must comply with section 5.4 "Ventilation System controls", and for this we should include controls that enable system t
Aeronautical Maintenance Workshop
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gustavo De las Heras Izquierdo on
This is a 70,000 sf Aeronautical Maintenance Workshop in Colombia with the following features: -The space is 6 meters height. -There are interior walls 5 meter height.
Minimum Air Performance: Ahrae 62.1 vs. Ashrae 170
NC-2009 IEQp1:Minimum IAQ Performanceposted by Daniel Joseph on
We are in the midst of certifying a Medical office core and shell building. Our scope includes the landscaping, parking lot, side walks, and building shell.
n/a
NC-2009 IEQp1:Minimum IAQ Performanceposted by Anastasia Makarenko on
Our project is a big confectionary plant situated in Russia.
natural ventilation design in hot and humid area
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jorng-ren Chern on
My project is a high rise residential building located in a hot and humid area.
Compliance with IEQ credit 2 error
NC-2009 IEQp1:Minimum IAQ Performanceposted by Manuel Martin Delgado on
After filling the sample form table IEQp1-4 and press calculate I get a Y (yes) in both compliance with IEQ prerequisite 1 and credit 2.
IEQp1 and 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Taylor Ralph on
In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone).