Forum quick links
Alternative Compliance path for international projects
NC-2009 IEQp1:Minimum IAQ Performanceposted by Susann Geithner on
The USGBC has published a draft for additional guidance for international projects. That includes alternative compliance paths and even additional LEED online forms for international projects.
Guard house's ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Florian Schmidtchen on
Hallo all, We have a project in one Asian Country, where the Guard house (Gate house) is using a split type unit to condition the room, without mechanical fresh air intake.
Is APPENDIX Needed
NC-2009 IEQp1:Minimum IAQ Performanceposted by ABDUL MUTHALIB MOHAMED on
In IEQp1 i already Upload 62MZcalc and Results from a Simulation Software and Fill the narrative Tab and all other but my check compliance is still indicate (Y) so my Doubt Whether we need to fi
IEQp1 ventilation cals
NC-2009 IEQp1:Minimum IAQ Performanceposted by Gordon Nielson on
I am calculating the ventilation requirements for a conference room. From the ASHRAE Table 6-1 I selected .06 cfm/ft2 and 5 cfm/person. The room has occupancy of 8 people.
Transfer air into residential units
NC-2009 IEQp1:Minimum IAQ Performanceposted by AshLee Eustace on
I'm trying to show compliance with IEQp1 using indirect mechanical ventilation in residential units. Makeup air units supply the corridors which indirectly ventilate the residential units.
Global Compliance Paths EN 15251
NC-2009 IEQp1:Minimum IAQ Performanceposted by Elodie DUMAS on
Hi, There's several quality level for interior air in EN 15251 : category I to III.
Kitchen Exhaust Make-Up Air
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Gary on
Can the make-up air (CFM) provided for a kitchen hood exhaust system be considered as part of the total OSA CFM, in the VRP calculation?
Master's Research Survey
NC-2009 IEQp1:Minimum IAQ Performanceposted by Vibha Pai on
I am conducting a survey in affiliation with University of Cincinnati for my Master's thesis which would take just 10-15 minutes of your time.
Industrial Plant Manufacturing Hall Ventilation
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sustainability Provider on
We are currently working on the design of an industrial plant (aluminum casting in specifics) with two sections - manufacturing hall and administrative/engineering offices.
Fresh air fan model
NC-2009 IEQp1:Minimum IAQ Performanceposted by Sivarajah Ragulakeethan on
Hi We are working on a Data center LEED project. Do we need to model the fresh air fan for server room area because there were already exhaust fan and fire suppression system?