Forum quick links
natural ventilation design in hot and humid area
NC-2009 IEQp1:Minimum IAQ Performanceposted by Jorng-ren Chern on
My project is a high rise residential building located in a hot and humid area.
Compliance with IEQ credit 2 error
NC-2009 IEQp1:Minimum IAQ Performanceposted by Manuel Martin Delgado on
After filling the sample form table IEQp1-4 and press calculate I get a Y (yes) in both compliance with IEQ prerequisite 1 and credit 2.
IEQp1 and 62MZCalc
NC-2009 IEQp1:Minimum IAQ Performanceposted by Taylor Ralph on
In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone).
IEQp1 ASHRAE 62.1 Calculator
NC-2009 IEQp1:Minimum IAQ Performanceposted by Shannon Allison on
I read through previous posts and have not seen an answer to this question so forgive me if I missed it. The ASHRAE calculator does not seem to apply to 100% outdoor air systems.
Split System Heat Pumps with Heat Recovery Ventilators
NC-2009 IEQp1:Minimum IAQ Performanceposted by Nancy Henderson on
We are working on a residential building that has common areas which are conditioned with split system heat pumps and heat recovery ventilators for fresh air.
IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Keerthi Ratnayake on
Hello, Please let me know where I can find definitions for the following. a. Mechanically ventilated spaces b. Naturally ventilated c. Mechanically conditioned e.
DCV vs IEQp1
NC-2009 IEQp1:Minimum IAQ Performanceposted by Marina Andrade on
Hi everyone! I have a project that the system works with outside air demand according to the CO2 sensor.
Natural Ventilation Form Filling
NC-2009 IEQp1:Minimum IAQ Performanceposted by Aaron Levey on
Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.
62MZ calc for critical zones
NC-2009 IEQp1:Minimum IAQ Performanceposted by Indochine Engineering VN on
Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.
Existing building with new addition compliance
NC-2009 IEQp1:Minimum IAQ Performanceposted by Saju Varghese on
we have a new addition added to an existing facility.