Post a question or comment
Credit Filters
Minimum IAQ Performance
Filter by location
Forum
Topic
Replies
Recent

natural ventilation design in hot and humid area

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Jorng-ren Chern  on 

My project is a high rise residential building located in a hot and humid area.

1
Mon Dec 23, 2013, 8:48 pm

Compliance with IEQ credit 2 error

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Manuel Martin Delgado  on 

After filling the sample form table IEQp1-4 and press calculate I get a Y (yes) in both compliance with IEQ prerequisite 1 and credit 2.

1
Thu Feb 2, 2017, 3:51 pm

IEQp1 and 62MZCalc

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Taylor Ralph  on 

In a project's IEQp1 we want to use a non-default value for occupancy of a Conference Room (a Critical Zone).

1
Thu Jun 9, 2011, 8:00 pm

IEQp1 ASHRAE 62.1 Calculator

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Shannon Allison  on 

I read through previous posts and have not seen an answer to this question so forgive me if I missed it. The ASHRAE calculator does not seem to apply to 100% outdoor air systems.

1
Wed Nov 9, 2011, 1:39 am

Split System Heat Pumps with Heat Recovery Ventilators

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Nancy Henderson  on 

We are working on a residential building that has common areas which are conditioned with split system heat pumps and heat recovery ventilators for fresh air.

1
Mon Jun 30, 2014, 3:24 pm

IEQp1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Keerthi Ratnayake  on 

Hello, Please let me know where I can find definitions for the following. a. Mechanically ventilated spaces b. Naturally ventilated c. Mechanically conditioned e.

1
Fri Mar 16, 2012, 5:49 pm

DCV vs IEQp1

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi everyone! I have a project that the system works with outside air demand according to the CO2 sensor.

1
Wed Oct 29, 2014, 4:59 pm

Natural Ventilation Form Filling

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Aaron Levey  on 

Hi everyone, We have a residential project which has around 600 rooms naturally ventilated. I've prepared an excel sheet to demonstrate compliance with natural ventilation requirements.

1
Wed Jul 18, 2012, 1:25 am

62MZ calc for critical zones

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Indochine Engineering VN  on 

Hi, my project has PAU to supply OA through VAVs to AHUs, which then supply air to office spaces. This PAU also supplies OA through CAVs to lift lobbies and FCUs recirculate the air there.

0

Existing building with new addition compliance

NC-2009 IEQp1:Minimum IAQ Performance
posted by  Saju Varghese  on 

we have a new addition added to an existing facility.

1
Wed Dec 30, 2015, 12:55 am