Forum quick links
EQp2 (ETS control) - use of air curtain
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Meike Borchers on
Does anyone know if air curtains have been allowed by USGBC to prevent tobacco smoke entering a building?
Non-smoking policy + signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Susie Spivey-Tilson on
We are finishing a LEED CI certification in a building that was LEED NC certified several years ago.
Signatory Statement and Signage
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Daniel Garavito on
We are currently working in a project located in New York City. The owner owns the entire floor where the project is located.
Exterior smoking policy
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Andrey Tsvetkov on
Dear all, We have a question about exterior non-smoking policy on the project NC.
Designated smoking area in park project?
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Heather Holdridge on
Our project is a gathering & educational space located within a huge park. We plan to have signages saying no smoking inside and within 25 ft of the building.
Residential Units - Pressure Testing
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Mallory Schaus on
We have a residential (apartment) building that is allowing smoking on one of the floors. After blower door testing and reparations, we have met the requirement for unit sealing.
Smoking Areas - Beside a Storage Room
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Patrice McVeigh on
Hi All, We are building a NC Campus Project that has a non smoking policy except in one designated outside area.
Type 1B Multi-family
NC-2009 IEQp2:Environmental Tobacco Smoke (ETS) Controlposted by Jeremy Kuhre on
Has anyone successfully pursued Option 2 Case 2 (blower door testing) for type 1B multi-family project?