Replacing filters prior to occupancy
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ashley Love on
**I did post this under the IEQc3.1 credit in Schools, too. My project is a school, but I wanted to make sure this question was seen, as my question is not "school only".
Lost IAQ Photos
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Melissa Wrolstad on
I am working on a project with an IAQ plan that was followed during construction.
LEED-NC for a residential building
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Michael E. Edmonds-Bauer on
We have a residential project that wishes to apply for LEED-NC, due to climate conditions no HVAC system will be implemented and 100% of ventilation will be natural (no mechanical equipment at all)
Are MERV equivalent filters for international projects accepted?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Jenelle Shapiro on
Hello - I'm working on a project in Japan, and the MERV rating system is not used here.
µg not µm?
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Takayuki Hirota on
Reference guide Addenda allows to use filtration media with a minimum dust spot efficiency of 30% or higher and greater than 90% arrestance on a particle size of 3–10 "µg". I suppose it is "µm" no
Temporary Natural Gas Winter Heat
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Greengrade User on
We are currently working on a LEED project where we are using temporary direct fire natural gas heaters for winter heat.
Scheduling
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Nouran Abdel-Rahman on
We are applying Carpets for flooring. Can we install the carpets, and cover them then install electric fixtures for the ceiling.
Duct Testing and Cleaning
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Ramon Ramos on
What is the criteria for triggering duct testing and cleaning reports for both plans?
HVAC Equipment Installation prior to Roof
NC-2009 IEQc3.1:Construction IAQ Management Plan—During Constructionposted by Maggie Pipek on
The contractor would like to install the HVAC equipment although the roof is not on the building yet.