EQc5 & Fume Hoods

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Laura Eubanks  on 

In order to meet EQc5 requirements, do science prep rooms have to be independently exhausted even if fume hoods are installed (given deck to deck partitions and self-closing doors are present as we

1
Sun Sep 25, 2016, 4:46 pm

Definition of hard-lid ceiling?

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Renee Shirey  on 

I have a situation where I cannot eliminate a sloped acoustic ceiling with a gyp ceiling, and the walls do not go up to the deck (they go to the underside of trusses).

1
Mon Nov 28, 2011, 11:43 pm

The building will provide

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Mike D  on 

The building will provide entrance mats for all major entrances. The building have retail units at the ground floor. Do each of those units have to have mats as well?

1
Mon Jun 17, 2013, 6:06 pm

Terraces, balconies, porches and walk-off mats

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  David Gibney  on 

I recall seeing a CIR a few years that addressed this issue but I'm unable to retrieve it at the Interpretations Database.

1
Fri Jan 31, 2014, 7:58 pm

Duct sealing methods

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  John Covello  on 

Hello, Can alternative methods for duct sealing be used besides plastic wrap? One of our contractors is proposing using foam to seal the end of the duct openings.

1
Fri Dec 5, 2014, 12:23 am

recessed walk off mat

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Bomin Kim  on 

We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.

1
Wed Apr 13, 2016, 12:08 am

Calculating the leakage area for a door

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Nishank Shah  on 

I needed some help in calculating the leakage area of a door. Lets say the door has a total area of 30 sq. ft. Now, how do I calculate the leakage area to insert in the equation: Q = CA (dp)^n

1
Wed Mar 22, 2017, 9:19 am

Owner maintained carpet entry systems

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  Susan Walter  on 

I have an in patient Hospital project and we are providing roof gardens and access to those gardens. Hooray for direct access to nature! My question in on the entryway systems.

1
Fri Mar 4, 2011, 2:55 pm

roll-out mat specs

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  NA AN  on 

I just want to check if there are any specific product specs for a LEED compliant roll-out mat? thank you Na

1
Thu Feb 7, 2013, 12:07 am

CONFUSED WITH FILTER RATING REQUIREMENT.

NC-2009 IEQc5:Indoor Chemical and Pollutant Source Control
posted by  VEL MUTHU  on 

Hi, I am working on a project where the design scheme follows las described below. There are ERU’s which supplies the fresh air to AHU’s and FCU’s in the project.

1