Forum quick links
1 VAV 2 offices, one restroom
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Saju Varghese on
Hello. I have a question regarding the controllability of thermal comfort for 2 offices.
pursuing thermal confort in a museum/gallery
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Angel Vega on
Our team is pursuing this credit for a museum/art galleries building. I´ve been checking the IAQ matrix and if I am strict, we should forget this credit.
Controls - Multioccupants space
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by SAMY Chamy on
Dear All:- Our project have meeting, conference, training rooms, Canteen (Food), pantry (Coffee stations) The meeting room have one round table with 9 occupants but table is single so we provide
FTE is linked to IEQc6.1 and IEQc6.2 - Healthcare buildings
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by VICTOR MORENO on
In our Healthcare project, there are different workers during the morning, afternoon and evening, with a time of 8 hours each. If I count the FTE, I get a total of workers greater to the number of
Operable Windows & Mechanical Ventilation
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Charalampos Giannikopoulos on
Would an operable window be an eligible type of thermal comfort control in a mechanically ventilated building or would such a control require that the building is naturally ventilated?
Individual Control for Transients- Healthcare Project
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by MURAT DOĞRU on
We have a 650-bed hospital building project registered under LEED v3-Healthcare. Whole building is mechanically ventilated and conditioned.
Operable windows
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Charalampos Giannikopoulos on
For an office space with 100 individual working spaces the project team has used operable windows in order to provide thermal comfort control.
Mixed Use Residential with Core & Shell retail on ground floor
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Erica Downs on
hello - We have primarily residential building with two core and shell retail spaces on the ground floor.
Interview Room with 2 seats
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by Maher Hemod on
what dose consider an interview room with 2 seats in a hospital project, is it individual occupant space or shared multi occupant ? Thanks in advance.
Use of Table fans in Working Desk
NC-2009 IEQc6.2:Controllability of Systems—Thermal Comfortposted by SAMY Chamy on
Dear all Our production area is sewing machines so we install table fan with switches in every sewing table.