Forum quick links
Multipurpose Space in Basement Regularly Occupied?
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Nelina Loiselle on
Thank you Todd for answering my previous question- Now I have another one.
Skylight coverage
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Adrienn Gelesz on
Hi, in case of a not meeting the skylight coverage ratio of 3-6% for the total room space, e.g.
Rolling Shades
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ema S on
Are rolling shades mandatory when doing the prescriptive method?
Option 4: Combination
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Rubén M. R. on
My project is an industrial plant with several buildings (all buildings going for one certification).
2 Types of Tviz in each window
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ileana Schinder on
The windows in my project have 2 types of t-viz in each window (above 8'0 is non visible light). How do you document 2 types of tviz in a single room? the excel file doesn't accomodate for that.
Prescriptive approach - adjusting VLT for an overhang
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ramana Koti on
Greetings all. One one of our LEED projects, we're using the prescriptive approach of VLT*WFR falling within the range of 0.15 and 0.18.
Design Submittal
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Gaston Viau on
This credit cannot be submitted on the deign phase if we choose option 3 (measurement) right? Thanks in advance for your time.
Include or Exclude a classroom auditorium
NC-2009 IEQc8.1:Daylight and Views—Daylightposted by Ashonta Langdon on
We are doing an addition to a classroom building on a college campus. A ~100 seat auditorium style classroom makes up about 25% of the regularly occupied space of the building.