Forum quick links
Where do you find the "Mitigated Design Storm Rainfall Volume" for the entire site (cu ft)?
EBOM-2009 SSc6:Stormwater Quantity Controlposted by bryan lauer on
For Miami-Dade County, FL.
In the SSc6 form, where do I find the "Mitigated design rainfall volume for the entire site (cu ft)? In the building
online form SI units not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by GEORGE GKLAVAS on
When using the same input data in both forms (IP and SI units) someone should expect the same result (percentage mitigated).
Online form not functioning correctly
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
I am having the same problem with the online form and pdf for ssc6. Has anyone figured this out?
Qualification for Credit
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Wendy Lao on
My site has no stormwater management facilities. It is surrounded by natural vegetation/open space, and parts of the land has hills.
Stormwater Management
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Randy Walsh on
Does installation of mechanical filter media into the storm drain help meet this requirement? (Flogard curb filter inlet)
Converting Inches to volume of rainfall
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Mihir Parikh on
Does anyone have an accurate way of converting total inches of rainfall to cubic feet as required by the credit?
Minimum drawdown rate calculation
EBOM-2009 SSc6:Stormwater Quantity Controlposted by Meryl Corsun on
I am trying to verify that the cisterns on site release stormwater quickly enough to capture 2-year 24-hour design storm events by calculating the minimum drawdown rate.