Post a question or comment
Credit Filters
Minimum Indoor Plumbing Fixture and Fitting Efficiency
Filter by location
Forum
Topic
Replies
Recent

Accounting for Shower Use by non-building occupants

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Deborah Lucking  on 

We have a campus project where FTEs from a number of buildings have access to showers and lockers in a separate "clubhouse" building.

1
Tue Dec 1, 2015, 4:18 pm
1
Thu Jul 1, 2010, 1:56 pm

Baseline confussion

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Mohamed Hesham  on 

i want to know what is the differences between the ipc baseline calculations ,the LEED EBOM baseline and the performance calculation, in the case i'm dealing with the building fixtures already comp

1
Mon Mar 31, 2014, 3:03 pm

Showerhead with multiple settings

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  AtSite Inc  on 

To receive all of the WEc2 points available, our project needs to install 1.0 gpm shower heads.

1
Wed Dec 21, 2016, 11:49 pm

Unable to obtain cut sheet

posted by  Simon Sue  on 
1
Fri Oct 22, 2010, 1:38 pm

Baseline Percent against what?

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Rory Cousino  on 

Please excuse my ignorance on this, but when determining the baseline to compare, I understand that it depends on the substantial completion date of the plumbing system and if before 1993, then use

1
Fri Apr 13, 2012, 8:24 pm

CHANGING FIXTURES TO MEET PREREQUISITE

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Daniel Rohe  on 

I have a building that was built before 1993 with airators that are 2.2. Inorder to meet the prequisite I have to change the Airators to .5.

1
Wed May 8, 2013, 1:54 pm

Partial Retrofit

posted by  Tim Trefzer  on 
1
Wed Mar 24, 2010, 2:11 pm

LEEDuser plumbing assessment template updated

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Tristan Roberts  on 

To all LEEDuser members using our Water Efficiency Economic Assessment Policy for WEp1: we have made a couple minor updates to it to improve it relative

1
Wed Jun 22, 2011, 8:27 pm

Kitchen Sinks

EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiency
posted by  Amanda Johnson  on 

Hi, we are working on an office tower EBOM project and one standard review remark concerned the absence of kitchen sinks.

1
Thu Oct 3, 2013, 11:22 am