Baseline Percent against what?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Rory Cousino on
Please excuse my ignorance on this, but when determining the baseline to compare, I understand that it depends on the substantial completion date of the plumbing system and if before 1993, then use
CHANGING FIXTURES TO MEET PREREQUISITE
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Daniel Rohe on
I have a building that was built before 1993 with airators that are 2.2. Inorder to meet the prequisite I have to change the Airators to .5.
Kitchen Sinks
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Amanda Johnson on
Hi, we are working on an office tower EBOM project and one standard review remark concerned the absence of kitchen sinks.
Project Teams: Offline Calculator Errors
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Batya Metalitz on
PROJECT TEAMS, PLEASE NOTE: The LEED 2009 EBOM WEp1 offline calculator is currently being revised because of functionality issues. A new version is expected to be posted in mid-2014.
Gym sinks- Private or Public?
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kathryn West on
has anyone ever successfully argued that sinks in gym locker rooms are more akin to "private" fixtures? Folks do all sorts of things other than wash their hands in there.
calculator v06
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by M. Galvao on
Hi, I'm using for the first time the "water use reduction calculator v06" and I have a question about the table "flush fixtures". When I have a toilet male, a toilet female and a urinal, what is t
Conventional and metering faucets
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Noriko Nagazumi on
Our project has conventional faucets and metering faucets on the same floor. Each of these faucets have different defined baselines.
Polluted well water use
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Magda Aghababyan on
Dear all, We have a project that uses water from a polluted well for toilet flushing. The water is of low quality and is not drinkable.
Multiple forms reqt. for AGMBC approach-LEED EBOM 2009 WEp1, C1
EBOM-2009 WEp1:Minimum Indoor Plumbing Fixture and Fitting Efficiencyposted by Kevin Sullivan on
Hi We are using the group approach under AGMBC ( Application Guide for Multiple Buildings and On-Campus Building Projects) guide for six buildings under the project's scope.