EBOM-2009 EAc1:Optimize Energy Performanceposted by Leandro Silva on
Dear all,
Good afternoon.
Case 2 Option 2C
EBOM-2009 EAc1:Optimize Energy Performanceposted by Patrick Cellie on
I am working with a convention center that is currently Silver certified under the v2009 EBOM rating system.
Portfolio Manager - All Requests Suspended for Energy Star Scores Until Early 2019
EBOM-2009 EAc1:Optimize Energy Performanceposted by Michelle Bracewell-Musson on
I will assume most are aware that Portfolio Manager has suspended applications for Energy Star Certification from September 2018 until early 2019. As a requirement for EAc1 to be earned,
LEED EBOM EA1 PR2 - Casino Hotels
EBOM-2009 EAc1:Optimize Energy Performanceposted by Aron Weis on
If a 6,000,000 square foot hotel/casino is more than 50% hotel space, are they required to use Option 1 - Portfolio Manager to get an Energy Star rating?
Office building, Jeddah, Saudi A
EBOM-2009 EAc1:Optimize Energy Performanceposted by Lise Dannesboe on
We have established a rating for the building based on Case 2 Option 1 - beacause the building is not eligible for an Energy Star rating.
Case 2 Calculator - Space Types
EBOM-2009 EAc1:Optimize Energy Performanceposted by Timothy Casper on
Our project is a mixed use building used by community groups and has several different space types within it (theater, classrooms, event areas, kitchen, offices).
Calculator
EBOM-2009 EAc1:Optimize Energy Performanceposted by Austin Evans on
In the Case 2 Option 2 tab for the offline calculator the cells are locked up on the option III enter current year EUI score as far as I can tell.
Fitness Center with swimming pool
EBOM-2009 EAc1:Optimize Energy Performanceposted by Hatice G. on
We are certifying a multi tenant building with different types of use. One of the use is a fitness center with an indoor swimming pool.
Case2 Option 1- Labs
EBOM-2009 EAc1:Optimize Energy Performanceposted by Alicia Villanueva on
The project is an innovation center, it has offices (63%), laboratory (28%) and data center (8%), the lab represents more than 10% of the area, we have to use the USGBC Calculator Case 2 Option 1-