Forum quick links
Manufacturing Equipment
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Jessica Kruse on
I have a manufacturing facility looking to earn the Electric - Powered equipment credit. We are counting monitors, printers, etc that are listed as required. What about production equip
Documenting salvaged items
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by American University on
What kind of documentation is required for salvaged materials? I'm thinking specifically in a campus setting where we are salvaging furniture from other buildings for use in the project building.
Durable Goods Purchase
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Janna Nash on
Could someone tell me if this would apply as a Durable Good purchase?
Are wine coolers/chillers/refrigerators eligible for Energy Star
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Haley Duncan on
I found several that say they are Energy Star certified, but they do not show up on Energy Star's database. Does anyone know if compact wine coolers are eligible for a rating?
problem with MR Cr2.1 template version 5 at LEED online
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sofia Otterheim on
Hello we got a problem when we finished uploading and filling information for MR cr 2.1with durable goods of electrical equpiment At the end of template, we clicked the check compliance button,
Vendor Letter Sample/Template?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Elliot Powers, LEED AP BD+C on
I may be mistaken, but I thought I saw in the Doc Toolkit some time ago that there was a template/sample available to send to vendors from whom our client makes purchases, and which would assist in
Hand Dryers- Are they Considered Durable Goods?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Geoffrey Tomlinson on
We are purchasing hand dryers to eliminate paper waste, but since there are no EnergyStar rated hand dryers, would this count against us for our durable goods purchasing the performance period?
Default Recycling Content
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Ralf Lehmann on
Is it possible to assume recycled content to be 25% postconsumer for steel comparable to New construction?