Forum quick links
problem with MR Cr2.1 template version 5 at LEED online
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Sofia Otterheim on
Hello we got a problem when we finished uploading and filling information for MR cr 2.1with durable goods of electrical equpiment At the end of template, we clicked the check compliance button,
Vendor Letter Sample/Template?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Elliot Powers, LEED AP BD+C on
I may be mistaken, but I thought I saw in the Doc Toolkit some time ago that there was a template/sample available to send to vendors from whom our client makes purchases, and which would assist in
Would LEASING a Battery Powered Floor Cleaner Meet Criteria?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Michelle Bracewell-Musson on
The client leases a large battery-operated floor cleaner, and the terms are for six years.
What qualifies to show energy star label??
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Jennifer Fitts on
We submitted for review and comments came back on our electronics portion of this credit for HP Elitebook 8450p and 2740p machines that do have energy star label.
MR 2.2 Form Change
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Fred Smith on
I am confused as the the new form on LEED On Line vs what you are showing on LEED User. I am not sure what is needed to upload in regards to our purchasing and criteria for sustainability.
hand dryers
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by mariela garate on
(this question is for 2.1 electric-power equipment) Does the use of an efficient hand dryer contribute to this or other credits? The company claims contribution to credits of Energy performance, a
Bike Rack?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Michelle Bracewell-Musson on
Hello, I have read to Reference Guide EMOB 2009 and cannot decide if a bike rack that will be permanently installed on the exterior of the building would comply here?
How do we qualify for offsite salvaged materials?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Katherine Ann Resurreccion on
Hello! Our client, (the project owner) has a branch office from another country wherein there are bulk of furniture which were transported 3 years ago to our recently registered LEED project.
Does Bill of Lading enough as supporting doc?
EBOM-2009 MRc2:Sustainable Purchasing—Durable Goodsposted by Katherine Ann Resurreccion on
From the the ACP for Regional Materials, it says "Products shipped by rail or water have been extracted, harvested or recovered, as well as manufactured within 500 miles total travel distance of th