IEQp1 Table. Case 1

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Calloway  on 

I am working on the IEQp1 LEED form and ran into a couple problems when filling out the information.

1
Tue Dec 6, 2011, 8:38 pm

10 cfm per person rule

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Jay Murray  on 

I have a small tenant space in a large high rise commercial building.

1
Thu Jul 17, 2014, 1:01 am

Critical Zone Identification

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  sanjay vashishtha  on 

We are doing a project in which building is of office type and is having 75 AHUs and each AHU is serving one specific tenant area, means there are 75 tenant. Each tenant area is almost 10,000 SF.

1
Fri Dec 14, 2012, 7:10 pm

Natural Ventilation vs. Exhaust Rates

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Jan Hesse  on 

We are working on an office project that is natural ventilated in whole. All occupied spaces fullfill the requirements for natural ventilation of ASHRAE 62.1.

1
Tue Aug 6, 2013, 4:34 pm

Ventilation rates for manufacturing facilities

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Omar Delgado  on 

I'm analyzing a manufacturing plant which is 70% manufacturing space and 30% warehouse. Do I need to follow the ACGIH Industrial Ventilation Manual to comply with this credit ?

1
Wed Mar 4, 2015, 3:15 pm

IAQ calculator v03

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Default Avatar
LEED AP, BREEAM Assessor, WELL AP, Fitwel Ambassador |Associate Director
Colliers International Poland
LEEDuser Basic Member
4 thumbs up
Mon May 8, 2017, 7:43 am

Filling the Minimum Performance Calculator for 100% OA

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Rasita Masalskyte  on 

SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Mar 3, 2017, 10:27 am

10% exemption

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that doesn't hav

4
Tue Jan 17, 2017, 12:27 am

EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  James Doyle  on 

Our EBOM 2009 project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the IEQp1-A1 VAV data input form.

4
Thu Dec 15, 2016, 10:53 pm

CO2 measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, In our project there are AHUs providing a mix of outdoor and return air.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Oct 27, 2016, 6:27 pm