Ashrae 62.1 vetilation rate - Constant OA with VAV system

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Bradford Crosby  on 

We have a constant volume air fan feeding many floors. It feeds the mechanical space using it as a plenum. At the floor level there is a Supply fan serving the VAV and Fan boxes.

1
Tue Dec 11, 2012, 6:54 pm

Using the calculator (continued)

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Christina Reeves  on 

Hello again, We now have the 62MZ spreadsheet working (thanks again!), but a few more questions have come up as our ME works through it. Can anyone provide some insight on these? 1.

1
Thu Feb 13, 2014, 6:02 pm

Occupancy Doubt

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Marina Andrade  on 

Hi everyone, i'm working in a office building that will be certified.

1
Wed Sep 3, 2014, 7:32 pm

Vacant Space Critical Zones

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Robert Calloway  on 

I am working on a building that has multiple floors that are completely stripped and wide open for new tenants to design the layout to.

1
Wed Feb 20, 2013, 6:54 pm

Option B Calculator

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Haley Duncan  on 

Where can I find the Option B Calculator that is used to calculate compliance with 10 CFM per person for AHU's unable to meet ASHRAE 62.1-2007?

1
Mon Jan 25, 2016, 10:59 pm

IAQ calculator v03

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Izabela Kwiecinska  on 

The new calculator (v2009v4_Minimum IAQ Performance Calculator_v03) from the Resources tab, does not count the ‘Zone Outdoor Airflow’ (column N) and it shows 0,00 no matter what system and values w

4
Default Avatar
LEED AP, BREEAM Assessor, WELL AP, Fitwel Ambassador |Associate Director
Colliers International Poland
LEEDuser Basic Member
4 thumbs up
Mon May 8, 2017, 7:43 am

Filling the Minimum Performance Calculator for 100% OA

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Rasita Masalskyte  on 

SIngle 100% outdoor air AHU is serving multiple zones (through diffusers) on couple of floors in a highrise office building.

4
Practice Leader - Sustainability
EUA
LEEDuser Expert
510 thumbs up
Fri Mar 3, 2017, 10:27 am

10% exemption

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Is it allowed to exclude up to 10% of spaces from this prerequisite? Our project is a 20-story building that complies with the ventilation rates but there is an office in the core that doesn't hav

4
Tue Jan 17, 2017, 12:27 am

EBOM IEQp1-A1 Statement "Would need over 100% OA Intake"

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  James Doyle  on 

Our EBOM 2009 project credit data has to be completed by 8-5 and I am getting a message "Would need over 100% OA Intake" at the end of the IEQp1-A1 VAV data input form.

4
Thu Dec 15, 2016, 10:53 pm

CO2 measurements

EBOM-2009 IEQp1:Minimum IAQ Performance
posted by  Gustavo De las Heras Izquierdo  on 

Hallo, In our project there are AHUs providing a mix of outdoor and return air.

2
Senior Sustainability Manager
WSP - Built Ecology
LEEDuser Expert
188 thumbs up
Thu Oct 27, 2016, 6:27 pm