Forum quick links
Indoor/Outdoor Carpeting in Large Open-Air Tropical Lobby
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Terry Gorski on
For a building located in a tropical climate with an open- air lobby around the elevator banks, would indoor/outdoor carpeting completely under the cover of the building meet the requirements?
recessed walk off mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Bomin Kim on
We are specifying a recessed walk off mat for the building in the vestibule (8' long). I remember that if the walk off mat is 10', a point is granted.
10' mat requirement with revolving door
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Jean Savitsky on
We have a building where there is a revolving door flanked by two hinge doors.
Loading Dock
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by David Wood on
I had a question in regards to loading dock.
Entrance door opening blocking mat
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Dina Al-Nakib on
We are installing mats at all the building's entrances.
Loading Docks
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Michael McPheron on
Our project consists of a manufacturing facility with 3 loading docks. These docks do not currently have an entryway system.
Classroom Entrances
EBOM-2009 IEQc3.5:Green Cleaning—Indoor Chemical and Pollutant Source Controlposted by Eddie Cuevas on
I am working on a project located on a college campus. The project building features an exposed atrium located in the center of the building.